| Date |
Text |
| 2015-02-13 14:26:30 | APPROVED WITH EXCEPTION. SEE PROVISO FOR COMPLIANCE: |
| | |
| | 1) NEC 600.3 LISTING. |
| | ELECTRIC SIGNS, SECTION SIGNS, AND OUTLINE LIGHTING |
| | SHALL BE LISTED AND INSTALLED IN CONFORMANCE WITH THAT |
| | LISTING, UNLESS OTHERWISE APPROVED BY SPECIAL |
| | PERMISSION. |
| | |
| | 2) NEC 600.6(A)(1) DISCONNECT |
| | EACH SIGN OR BRANCH CIRCUIT SUPPLYING A SIGN, SHALL BE |
| | CONTROLLED BY AN EXTERNALLY OPERABLE SWITCH OR CIRCUIT |
| | BREAKER THAT WILL OPEN ALL UNGROUNDED CONDUCTORS WITHIN |
| | SIGHT OF THE SIGN. |
| | |
| | 3) FBC-E 505.2.4 CONTROL |
| | LIGHTING FOR ALL EXTERIOR APPLICATIONS NOT EXEMPTED IN |
| | SECTION 505.1 SHALL HAVE AUTOMATIC CONTROLS CAPABLE OF |
| | TURNING OFF EXTERIOR LIGHTING WHEN SUFFICIENT DAYLIGHT |
| | IS AVAILABLE OR WHEN THE LIGHTING IS NOT REQUIRED. |
| | LIGHTING NOT DESIGNATED FOR DUSK-TO-DAWN OPERATION |
| | SHALL BE CONTROLLED BY EITHER A PHOTOSENSOR AND A TIME |
| | SWITCH, OR AN ASTRONOMICAL TIME SWITCH. LIGHTING |
| | DESIGNATED FOR DUSK-TO-DAWN OPERATION SHALL BE |
| | CONTROLLED BY AN ASTRONOMICAL TIME SWITCH OR |
| | PHOTOSENSOR. ALL TIME SWITCHES SHALL BE CAPABLE OF |
| | RETAINING PROGRAMMING DURING LOSS OF POWER FOR A PERIOD |
| | OF AT LEAST 10 HOURS. |
| | |
| | 4) WPB AMENDMENTS. FBC SECTION 109.3 VALUATION |
| | PROVIDE PROOF OF OVERALL VALUE OF THE PROJECT IS |
| | REQUIRED AND SHALL BE THE TOTAL REPLACEMENT VALUE TO |
| | INCLUDE ARCHITECTURAL DESIGN FEES, FABRICATION, |
| | STRUCTURAL, AND ELECTRICAL, PLUS OVERHEAD AND PROFIT. |
| | FINAL PERMIT VALUATION SHALL BE SET BY THE BUILDING |
| | OFFICIAL. |
| | |