| Date |
Text |
| 2014-11-14 15:26:18 | 11/14/2014 |
| | PROJECT: MARATHON SIGN |
| | PERMIT#: 14100680 |
| | CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC |
| | ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, |
| | ADMINISTRATION, 2012 FBC SUPPLEMENTS. |
| | 1ST ELECTRICAL PLAN REVIEW |
| | ACTION: APPROVED WITH EXCEPTION |
| | |
| | 1) NEC 600.5 |
| | EACH COMMERCIAL OCCUPANCY ACCESSIBLE TO PEDESTRIANS |
| | SHALL BE PROVIDED WITH AT LEAST ONE OUTLET SUPPLIED BY |
| | A BRANCH CIRCUIT RATED AT LEAST 20 AMPERES THAT |
| | SUPPLIES NO OTHER LOAD. VERIFY ON SITE. |
| | |
| | 2) 600.3 LISTING. |
| | ELECTRIC SIGNS, SECTION SIGNS, AND OUTLINE LIGHTING ? |
| | FIXED, MOBILE, OR PORTABLE ? SHALL BE LISTED AND |
| | INSTALLED IN CONFORMANCE WITH THAT LISTING, UNLESS |
| | OTHERWISE APPROVED BY SPECIAL PERMISSION. VERIFY ON |
| | SITE. |
| | |
| | 3) NEC 600.6(A)(1) LOCATION. |
| | EACH SIGN AND OUTLINE LIGHTING SYSTEM, OR FEEDER |
| | CIRCUIT OR BRANCH CIRCUIT SUPPLYING A SIGN OR OUT-LINE |
| | LIGHTING SYSTEM, SHALL BE CONTROLLED BY AN EXTERNALLY |
| | OPERABLE SWITCH OR CIRCUIT BREAKER THAT WILL OPEN ALL |
| | UNGROUNDED CONDUCTORS WITHIN SIGHT OF THE SIGN OR |
| | OUTLINE LIGHTING SYSTEM THAT IT CONTROLS. |
| | VERIFY ON SITE. |
| | |
| | 4) FBC-E 505.2.4 |
| | ALL EXTERIOR LIGHTING NOT EXEMPTED BY FBC 505.1 SHALL |
| | HAVE AUTOMATIC CONTROLS TO TURN OFF AT DAYLIGHT OR WHEN |
| | NOT REQUIRED. CONTROLS SHALL BE PHOTOSENSOR & TIME |
| | CLOCK OR ASTRONOMICAL TIME SWITCH. ALL TIME SWITCHES |
| | SHALL BE CAPABLE OF RETAINING PROGRAMING DURING A LOSS |
| | OF POWER FOR A MINIMUM OF 10 HOURS. VERIFY ON SITE. |
| | |
| | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |
| | 561-805-6717 OR [email protected] |
| | |