| Plan Review Notes For Permit 14100350 |
| Permit Number |
14100350 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2014-10-30 08:53:21 | 1) SUBMIT DRAWINGS FOR THE PNEEUMATIC TUBE SYSTEM AT | | | THE DRIVE THROUGH IF THAT IS BEING REPLACED. WPB AMEND. | | | TO 2010 FBC SEC. 107.2.1. | | | 2) SHT. A-3 - THERE ARE VTR'S THAT APPEAR TO BE WITHIN | | | 10 FT. OF THE ROOF TOP UNITS AC-1, AC-2, AC-3. IF THE | | | UNITS HAVE INTAKE/MAKEUP AIR CAPABILITIES THE VENTS | | | SHALL COMPLY W/ 2010 FPC SEC.904.5. | | | 3) SHT. P-3 - THE CONDENSATE DRAINS CANNOT DISCHARGE TO | | | THE SANITARY SYSTYM PER CITY ORD. SEC. 90-126. | | | 4) CLEAR WATER WASTE 9CONDENSATE) SHALL NOT DISCHARGE | | | TO THE GREASY WASTE SYSTEM PER THE 2010 FPC SEC.1003.2. | | | 5) SIZE THE HOT AND COLD WATER LINES TO THE EMPLOYEE | | | RESTROOM FIXTURES. THE JANITOR SINK IS NOT SHOWN ON THE | | | WATER RISER. WPB AMEND. TO 2010 FBC SEC. 107.2.1. | | | 6) SUBMIT MANUF. SPECIFICATIONS/INSTALLATION | | | INSTRUCTIONS FOR TANKLESS WATER HEATER. WPB AMEND. TO | | | 2010 FBC SEC. 107.2.1. | | | 7) SUBMIT A GAS RISER DIAGRAM FOR ANY CHANGES TO THE | | | GAS SYSTEM.WPB AMEND. TO 2010 FBC SEC. 107.2.1. | | | INDICATE ON SHT.P-4 IF THE LP GAS TANK & PIPING IS NEW | | | OR EXISTING. IF NEW, SUBMIT A GAS RISER FOR THIS | | | INSTALLATION.WPB AMEND. TO 2010 FBC SEC. 107.2.1. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|