| 2014-09-24 10:35:18 | DATE: 9/24/2014 |
| | PROJECT: DUPONT RENNOVATION |
| | PERMIT#: 14090842 |
| | CODE: 2008 EDITION OF THE NEC |
| | 2010 EDITION OF THE FBC |
| | 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, |
| | ADMINISTRATION, 2012 FBC SUPPLEMENTS. |
| | |
| | 1ST ELECTRICAL PLAN REVIEW |
| | ACTION: DENIED |
| | |
| | 1) REVISE PANEL SCHEDULES TO INCLUDE ALL A/C UNITS AND |
| | AND RECEPTACLE CIRCUITS THROUGHOUT. |
| | |
| | 2) REVISE LOAD CALCULATION TO INCLUDE LOADS FOR ALL |
| | CIRCUITS IN REVISED PANEL SCHEDULES INCLUDING ALL A/C |
| | AND HEATING LOADS. |
| | |
| | 3) REVISE RISER DIAGRAM TO INCLUDE THE GROUNDING |
| | ELECTRODE SYSTEM DETAIL, AS WELL AS CONDUIT AND WIRE |
| | SIZES AND TYPES. |
| | |
| | 4) REVISE FLOOR PLAN TO INCLUDE CIRCUITING FOR OUTLETS, |
| | LIGHTING AND EQUIPMENT TO CORESPOND TO REVISED PANEL |
| | SCHEDULES. |
| | |
| | 5) THE BRANCH CIRCUIT FEEDING THE UNIT EQUIPMENT SHALL |
| | BE THE SAME BRANCH CIRCUIT AS THAT SERVING THE NORMAL |
| | LIGHTING IN THE AREA AND CONNECTED AHEAD OF ANY LOCAL |
| | SWITCHES. THE BRANCH CIRCUIT THAT FEEDS UNIT EQUIPMENT |
| | SHALL BE CLEARLY IDENTIFIED AT THE DISTRIBUTION PANEL. |
| | EMERGENCY LUMINAIRES THAT OBTAIN POWER FROM A UNIT |
| | EQUIPMENT AND ARE NOT PART OF THE UNIT EQUIPMENT SHALL |
| | BE WIRED TO THE UNIT EQUIPMENT AS REQUIRED BY 700.9 AND |
| | BY ONE OF THE WIRING METHODS OF CHAPTER 3. NEC |
| | 700.12(F) CIRCUIT THE EMERGENCY AND EXIT LIGHTING TO BE |
| | WIRED AHEAD OF ANY SWITCHING AND ON THE SAME CIRCUIT |
| | AND THE GENERAL LIGHTING IN THE AREA THEY SERVE. NEC |
| | 700.12(F) |
| | B.)EMERGENCY ILLUMINATION SHALL INCLUDE ALL REQUIRED |
| | MEANS OF EGRESS LIGHTING, ILLUMINATED EXIT SIGNS, AND |
| | ALL OTHER LIGHTS SPECIFIED AS NECESSARY TO PROVIDE |
| | REQUIRED ILLUMINATION. EMERGENCY LIGHTING SYSTEMS SHALL |
| | BE DESIGNED AND INSTALLED SO THAT THE FAILURE OF ANY |
| | INDIVIDUAL LIGHTING ELEMENT, SUCH AS THE BURNING OUT OF |
| | A LAMP, CANNOT LEAVE IN TOTAL DARKNESS ANY SPACE THAT |
| | REQUIRES EMERGENCY ILLUMINATION. NEC 700.16 ADDITIONAL |
| | EMERGENCY FIXTURES WILL BE REQUIRED TO ACCOMPLISH THIS. |
| | SEE AREAS AT STAIRWELL AND AREAS BETWEEN NEW |
| | PARTITIONS. NEC 700.16 |
| | |
| | 6) PROVIDE A LIGHTING DENSITY SUMMARY ON THE PLAN |
| | SHOWING COMPLIANCE WITH THE FLORIDA BUILDING ENERGY |
| | CODE REQUIREMENTS. FBC - ENERGY 505.3 |
| | |
| | 7) LIGHTING SYSTEMS SHALL BE PROVIDED WITH CONTROLS AS |
| | REQUIRED IN FBC - ENERGY 505.2.1, 505.2.2, 505.2.3 AND |
| | 505.2.4. |
| | BUILDINGS LARGER THAN 5,000 SQUARE FEET (465 M2) SHALL |
| | BE EQUIPPED WITH AN AUTOMATIC CONTROL DEVICE TO SHUT |
| | OFF LIGHTING IN THOSE AREAS. FBC 505.2.2. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. SEE LINK: |
| | HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ |
| | 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF |
| | |
| | ADDITIONALLY, PLEASE INSERT CORRECTED PAGES INTO |
| | SUBMITTAL PACKAGE AND LEAVE THE PREVIOUSLY REVIEWED |
| | SHEETS FOR COMPARATIVE REVIEW. |
| | |
| | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |
| | 561-805-6717 OR [email protected] |
| | |