| Date |
Text |
| 2014-10-15 14:26:03 | 1) PLANS SUBMITTED SHOW TWO DIFFERENT SETS OF PLANS-ONE |
| | HAS HEADING OF SUPPLEMENTAL DRAWINGS BUT ARE FROM A |
| | DIFFERENT ARCHITECT. PROVIDE COMPLIANCE W/ FL, ADMIN. |
| | CODE RULE 61G1-23.015. |
| | 2) THE PLANS FROM PUBLIX DESIGN DEPARTMENT REFER TO |
| | CIVIL DRAWINGS BUT THERE ARE NO CIVIL DRAWINGS IN THE |
| | SET OF PLANS. SUBMIT A COMPLETE SET OF CIVIL DRAWINGS |
| | FOR REVIEW.WPB AMEND. TO 2010 FBC SEC.107.2.1. |
| | 3) SHOW THE SQUARE FOOTAGE OF THE CANOPY THAT IS |
| | DRAINED BY THE 10" X 5" GUTTERS. |
| | 4) SHT. P100 - SUMP PUMP DETAIL - NOTES" REFER TO SLAB |
| | UNDER DRAINDRAIN DETAIL." THERE IS NO DRAIN DETAIL. |
| | CLARIFY. |
| | 5) A UNISEX TOILET ROOM IS REQUIRED PER TABLE 403.1 |
| | FOOTNOTE "G" AND 2010 FPC SEC.403.5. |
| | 6) SHT. EQ-1 - SUBMIT DETAILS FOR THE GREASE CONTAINER |
| | REFERENCED BETWEEN GRID LINES #9 & #10. WPB AMEND. TO |
| | 2010FBC SEC. 107.2.1. |
| | 7) SHT. A-2 - THE SINK IN THE LOUNGE SHALL COMPLY WITH |
| | THE FL. ACCESSIBILITY CODE SEC.212. |
| | 8) SHT. A-8 - SOME OF THE PLUMBING VENTS APPEAR TO BE |
| | WITHIN 10 FT. OF AIR INTAKE OPENINGS ON THE ROOF.. |
| | COMPLY W/ FPC SEC.904.5. PLACE A NOTE ON THE PLAN |
| | STATING THAT THE PLUMBING VENTS THROUGH THE ROOF WILL |
| | COMPLY W/ SEC.904.5 OF THE FPC. |
| | 9) SHT. A-8 - SOME OF THE INFO & EQUIPMENT APPEARS TO |
| | BE CUT OFF/ MISSING FROM THE ROOF PLAN. CLARIFY. |
| | 10) SHT A-9 -TOILET ACCESSORY LEGEND - ITEM R18 REFERS |
| | TO VERTICAL GRAB BAR- GRAB BARS SHALL BE INSTALLED IN A |
| | HORIZONTAL POSITION PER THE FACBC SEC.609.4. |
| | 11) SHT.A-9 - SHOWS THE STANDARD TOILET STALL IN THE |
| | WOMEN'S RESTROOM AS 34 1/8 INCHES WIDE AND 5 FT. IN |
| | LENGTH AND SHT. ADA-1 SHOWS THE STALL AS 3 FT. WIDE AND |
| | 6 FT.2 INCHES IN LENGTH. CLARIFY. |
| | 12) SHT.P-1 - DRAWING NOTES - #30 - STATES THE GAS LINE |
| | TO THE STANDBY GENERATOR TO BE 1 1/2 " BUT THE PLAAN |
| | APPEARS TO SHOW 2". CLARIFY. |
| | 13) SHT. P-1- PLUMBING DESIGN DATA - EMERGENCY |
| | GENERATOR GAS LINE SIZING - SHOWS THE PIPE LENGTHAS 20 |
| | FT.BUT 12 FT. IS USED IN THE EQUATION. CLARIFY. |
| | 14) SUBMIT MANUFACTURER SPECIFICATIONS FOR THE |
| | GENERATORS. GENERATORS SHALL COMPLY WITH NFPA 37 AND |
| | MEET THE REQUIREMENTS OF UL 2200. WPB AMEND. TO 2010 |
| | FBC SEC.,107.2.1. |
| | 15) SHT.P-2 - FIXTURE P-23 IS SHOWN ON THE FLOOR PLAN |
| | BUT NOT ON THE RISER DIAGRAM. |
| | 16) SHT. P-2 - FIXTURE P-18 IS SHOWN ON SHT.P-1 BUT NOT |
| | ON THE RISER ON SHT. P-2. |
| | 17) SUBMIT MANUF. SPEC SHEETS FOR THE STANCOR OIL |
| | MINDER PUMP. WPB AMEND.TO 2010 FBC SEC.107.2.1. |
| | 18) SHT. P-3 - SHOWS CONDENSATE DRAINING INTO THE |
| | GREASY WASTE SYSTEM. WASTES THAT DO NOT REQUIRE |
| | TREATMENT OR SEPARATION SHALL NOT BE DISCHARGED INTO |
| | ANY SEPARATOR OR INTERCEPTOR. 2010 FPC SEC.1003.2. SEE |
| | CONDENSATES IN MEAT & DELI DEPARTMENTS. |
| | 19) SHT.P-4 - GROUND FLOOR BATHROOMS SHOWS THE |
| | CLEANOUTS FOR THE STACKS TURNED INTO THE MEAT COOLER. |
| | IS THIS CORRECT? CLARIFY. |
| | 20) SHT. P-4 - THE VENT FROM THE FIRST FLOOR RESTROOMS |
| | IS 3" THEN REDUCES TO 2" AT THE VENT CONNECTION W/ |
| | FIXTURE P-5.CLARIFY. |
| | 21) SHT. P-4 - THE VENT FROM FIXTURE P-5 IN THE WOMEN'S |
| | RESTROOM IS SHOWN AS 2" THEN INCREASES TO 3". CLARIFY. |
| | 22) SHT. P-4 - SIZE THE DRAIN LINE FOR FIXTURE P-5 IN |
| | THE MEN'S RESTROOM. |
| | 23) SHT.P-4 - SHOWS THE CONDENSATE FROM AH-2 DRAINING |
| | INTO THE GREASY WASTE. WASTES THAT DO NOT REQUIRE |
| | TREATMENT OR SEPARATION SHALL NOT BE DISCHARGED INTO |
| | ANY SEPARATOR OR INTERCEPTOR. 2010 FPC SEC.1003.2. |
| | 24) SHT. P-6 - DETAIL #5 - THE DESIGN OF THE |
| | INTERCEPTOR DOES NOT COMPLY W/ SEC.1003.5.2 OF THE 2010 |
| | FPC. THE INLET INVERT SHALL DISCHARGE A MINIMUM OF 2 |
| | 1/2 " ABOVE THE LIQUID LEVEL LINE AND THE INLET AND |
| | OUTLET PIPING SHALL BE A MIN. OF 4" IN DIAMETER. |
| | 25) THE DRINKING FOUNTAINS SHALL BE AVAILABLE TO PUBLIC |
| | FOR USE. A MINIMUM OF 2 DRINKING FOUNTAINS SHALL BE |
| | INSTALLED ON THE FIRST FLOOR FOR CUSTOMERS IN |
| | ACCORDANCE WITH THE 2010 FL. ACCESSIBILITY CODE |
| | SEC.211.2 |
| | 26) SHT. P-3 - GREASE INTERCEPTOR SIZING - THE SIZING |
| | CRITERIA SHOWN ON THE PLANS IS FOR HYDRO-MECHANICAL |
| | TYPE INTERCEPTORS. DETAIL #5 ON SHT.P-6 SHOWS A |
| | CONCRETE VAULT GRAVITY INTERCEPTOR. YOU CANNOT USE THE |
| | CRITERIA FOR A HYDRO-MECHANICAL UNIT TO SIZE A GRAVITY |
| | TYPE INTERCEPTOR. THE FORMULAS IN TABLE 1003.5.1 MUST |
| | BE USED FOR THE GRAVITY INTERCEPTOR. REFER TO 2010 FPC |
| | SEC.1003.5.1. |