| Date |
Text |
| 2015-04-13 10:38:40 | 4/13/2015 |
| | PROJECT: DIXIE/MANGO PARKING LOT UPGRADES |
| | PERMIT#: 14090658 |
| | CODE: 2008 EDITION OF THE NEC |
| | 2010 EDITION OF THE FBC |
| | 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, |
| | ADMINISTRATION, 2012 FBC SUPPLEMENTS. |
| | |
| | 2ND ELECTRICAL PLAN REVIEW |
| | ACTION: APPROVED WITH EXCEPTION. THE PLANS HAVE BEEN |
| | APPROVED PROVISIONALLY. FAILURE TO CORRECT THE LISTED |
| | DEFICIENCIES PRIOR TO INSPECTION WILL RESULT IN FAILED |
| | INSPECTION(S) AND THE ASSESSMENT OF RE-INSPECTION |
| | FEE(S). |
| | |
| | 1) PROVIDE MANUFACTURER PRODUCT SPECIFICATIONS |
| | INDICATING THE SOLAR PAY STATIONS ARE LISTED AND LABLED |
| | BY A NATIONALLY RECOGNIZED TESTING LAB. THE "CE" MARK |
| | IS NOT RECOGNIZED IN THE US. SEE THE NEC 690.4(D), NEC |
| | 110.3(B) |
| | |
| | 2) THE MANUFACTURER'S DOCUMENTATION SHALL ALSO INCLUDE |
| | THE DETAILS REQUIRED FOR THE INSTALLATION INDICATING |
| | COMPLIANCE WITH THE NEC ARTICLE 690 |
| | |
| | 3) VERIFY VALUATION OF IMPROVEMENTS INCLUDING ALL |
| | LABOR, MATERIALS, EQUIPMENT AND SUB-CONTRACTS.THE |
| | STATED VALUE OF THE PROJECT IS NOT REALISTIC. PROVIDE |
| | SUPPORTING DOCUMENTATION OF IT'S VALIDITY OR THE ALUE |
| | WILL BE ALTERRED BY THE BUILDING OFFICIAL. FBC WPB |
| | AMENDMENTS. SECTION 109.3. |
| | |
| | 4) IF THE DESIGN CAN BE APPROVED BY MEETING THE ABOVE |
| | NOTED DEFICIENCIES AN ELECTRICAL APPLICATION FROM A |
| | REGISTERED ELECTRICAL CONTRACTOR WILL BE REQUIRED TO |
| | VERIFY THE INSTALLATION MEETS OR EXCEEDS THE MINIMUM |
| | CRITERIA NOTED ABOVE. |
| | |
| | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |
| | 561-805-6717 OR [email protected] |
| | |