| Date |
Text |
| 2014-11-03 15:26:53 | 1) CLEANOUTS ARE REQUIRED IN THE BASE OF SOIL AND WASTE |
| | STACKS PER THE 2010 FBCR SEC.P3005.2.6. - 2ND REQUEST. |
| | 2) THE LAYOUT OF THE FIXTURES ON THE SANITARY RISER |
| | DOES NOT CORRELATE WITH THE LAYOUT ON THE FLOOR PLAN, |
| | WPB AMEND. TO 2010 FBC SEC. 107.2.1. 2ND REQUEST. |
| | 3) THE SANITARY RISER DIAGRAM SHOWS A FLAT, DRY VENT |
| | FOR THE FIRST FLOOR WATER CLOSET IN THE POOL BATH AND |
| | ALSO FOR THE SECOND FLOOR WATER CLOSET IN THE MASTER |
| | BATH. EVERY DRY VENT SHALL RISE VERTICALLY TO A MINIMUM |
| | OF SIX INCHES ABOVE THE FLOOD LEVEL RIM OF THE HIGHEST |
| | TRAP OR TRAPPED FIXTURE BEIN VENTED BEFORE OFFSETTING . |
| | 2010 FBCR, SEC. P 3104.4. |
| | 4) SECOND FLOOR MASTER BATH - THE WASHING MACHINE IS |
| | NOT PERMITTED TO BE INSTALLED ON A HORIZONTAL WET VENT |
| | PER SEC.P3108.1 OF 2010 FBCR. |
| | 5) THE 1 INCH INDIRECT WASTE PIPE FOR THE ICE MAKER IS |
| | NOT TO CODE. THIS DRAIN IS CONNECTED TO THE SANITARY |
| | SYSTEM THEREFOR SHALL BE TRAPPED & VENTED TO PREVENT |
| | SEWER GAS FROM ENTERING THE STRUCTURE. @010 FBCR |
| | SEC.P2706.1. |
| | 6) DRAIN PIPING BELOW GRADE SHALL BE A MINIMUM OF 1 |
| | 1/2" PER FBCR P2903.5. |
| | 7) SHOCK ARRESTORS SHALL BE INSTALLED ON THE ICE |
| | MACHINE, DISHWASHER AND WASHING MACHINE. FBCR |
| | SEC.P2903.5 |
| | . |
| | GAS: |
| | 8) THE SPECIFICATION SHEETS SUBMITTED FOR THE GAS |
| | GENERATOR & WATER HEATER DO NOT SHOW THAT THE |
| | APPLIANCES ARE LISTED AND LABELED IN ACCORDANCE WITH |
| | THE 2010 FBCR SEC.G2404.3. |
| | 9) SUBMIT CALCULATIONS FOR COMBUSTION AIR & VENT |
| | DETAILS.COMPLY W/ 2010 FBCRG (GAS) SECS. G2407.1, |
| | G2407.5, G2439.4. |
| | 10) THE GENERATOR SHALL COMPLY W/ NFPA 37 FOR THE |
| | LOCATION AND ALSSO MEET UL 2200 STANDARD. |
| | 11) NFPA 37 - SEC 4.1.4 - ENGINES SHALL BE 5 FT. FROM |
| | OPENINGS IN WALLS & 5 FT. FROM COMBUSTIBLE WALLS UNLESS |
| | THE WALL HAS A FIRE RESISTANCE RATING OF AT LEAST 1 HR. |
| | AND THE ENCLOSURE MUST BE OF NON- COMBUSTIBLE |
| | CONSTRUCTION. |
| | 12) SHOW THE LOCATION OF THE GENERATOR EXHAUST ON THE |
| | PLAN. EXHAUST SHALL BE 10 FT. FROM BUILDING OPENINGS |
| | AND AIR INTAKE VENTS. |
| | 13) THE SECTION OF P.E. GAS PIPING BETWEEN THE TEE FOR |
| | THE INTERIOR AND THE 2 PSI REGULATOR SHALL BE 1 " IN |
| | SIZE AS THE BTU LOAD IS 997,000. THE GAS SIZING TABLE |
| | NOTES THAT THE MAXIMUM BTU LOAD ON 3/4" PE PIPE IS |
| | 860,000. |
| | 14) SHT.A-0.1 - CLARIFY THE USE OF THE 1" TEE ON THE |
| | CSST PIPING RISER. |
| | 15) SHOW THE LOCATION OF THE LOW PRESSURE REGULATOR |
| | (2ND STAGE ) REGULATOR FOR THE CSST. I NEED THIS INFO |
| | TO CHECK THE SIZING OF THE SYSTEM. |
| | 16) THE CSST RISER CHANGES SIZE FROM THE REGULATOR FROM |
| | 1/2 " TO 3/4" AND THEN BACK TO 1/2" AGAIN. CLARIFY. |
| | 17) THE EHD OF THE CSST NEEDS TO BE 23 INSTEAD OF 19 TO |
| | HANDLE THE BTU LOAD. |
| | |
| | NOTE: YOU CAN PLACE A NOTE ON THE PLANS THAT "GAS TO BE |
| | UNDER SEPARATE PERMIT " AND YOU CAN ADDRESS THE GAS |
| | COMMENTS AT THAT TIME. YOU WILL HAVE TO REMOVE ALL THE |
| | GAS DRAWINGS FROM THIS PERMIT IF YOU CHOOSE TO DO SO. |
| | AS FOR THE PLUMBING COMMENTS, |
| | YOU MAY CALL ME TO DISCUSS THE COMMENTS OR WE CAN MEET |
| | AFTER ALL THE REVIEWS ARE COMPLETE AND GO OVER THEM.. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | , |