| 2014-09-26 09:28:31 | ENGINEERING/PUBLIC WORKS DEPT. |
| | |
| | AS MENTIONED DURING THE PPRC REVIEW, AN ENGINEERING |
| | DEVELOPMENT PERMIT APPLICATION IS REQUIRED FOR THIS |
| | PROJECT. CONSTRUCTION DETAILS OF THE WATER, SEWER, |
| | STORMWATER, TRAFFIC CIRCULATION, AND SOLID WASTE |
| | COLLECT WILL BE REVIEWED AS PART OF THAT APPLICATION |
| | PROCESSES. THE APPLICATION FORM AND CITY STANDARD |
| | CONSTRUCTION DETAILS CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | 1. INDICATE THE LOCATIONS OF THE DUMPSTERS INTENDED TO |
| | BE SERVICE BY THE CITY OF WEST PALM BEACH SANITATION |
| | DEPARTMENT. DUMPSTERS MUST BE EASILY ACCESSIBLE BY THE |
| | CITY EQUIPMENT AND MANPOWER. INCLUDE AN ESTIMATE OF THE |
| | SOLID WASTE YARDAGE ANTICIPATED TO BE GENERATED BY THE |
| | EXPANDED FACILITY. |
| | |
| | 2. DEMONSTRATE THAT THE PROJECT WILL PROVIDE ADEQUATE |
| | DRAINAGE AND STORMWATER MANAGEMENT. COMPLIANCE WITH |
| | CHAPTER 40E-4 WILL DEMONSTRATE COMPLIANCE WITH THIS |
| | PROVISION [SECTIONS 90-201, 94-35(C )(11), AND 94-307 |
| | OF THE CODE OF ORDINANCES]. THE PROPOSED WET DETENTION |
| | LOCATIONS DO NOT MEET SFWMD?S DIMENSIONAL/SIZE CRITERIA |
| | FOR WET DETENTION. THE CALCULATIONS SHOULD DEMONSTRATE |
| | THAT THE RUNOFF WILL ACTUALLY BE DETAINED IN THE DRY |
| | DETENTION AREAS (RATHER THAN IN THE CANALS AND DITCHES) |
| | IF THEY ARE CONSIDERED TO PROVIDE WATER QUALITY |
| | TREATMENT. THE DESIGN ALSO APPEARS TO ALLOW UNTREATED |
| | RUNOFF TO ENTER THE PERIMETER CANAL FROM THE OUTSIDE |
| | LANE OF THE PROPOSED ACCESS ROAD. |
| | |
| | 3. SHOW THAT ALL POTABLE WATER, STORMWATER, AND |
| | SANITARY SEWER CROSSINGS MEET THE SEPARATION |
| | REQUIREMENTS OF RULES 62-555.314 AND 62-604 FAC |
| | |
| | 4. PLEASE CLARIFY WHETHER OR NOT THE PLANT SUPPLY WATER |
| | IS POTABLE OR NON-POTABLE. |
| | |
| | 5. SEE THE FIRE DEPARTMENT COMMENTS FOR THE |
| | REQUIREMENTS FOR FIRE SUPPLY LINES, WHICH WILL INCLUDE |
| | THE PROPOSED POTABLE WATER LINE IF A SEPARATE FIRE LINE |
| | IS NOT PROVIDED. |
| | |
| | 6. INDICATE THE MATERIAL PROPOSED FOR THE NEW POTABLE |
| | WATER, SANITARY, AND STORMWATER LINES. WATER LINES MUST |
| | MEET THE REQUIREMENTS OF RULE 62-555.340 FAC. |
| | |
| | 7. REVISE THE PLANS TO MEET THE DOUBLE VALVE |
| | REQUIREMENTS AND IDENTIFY THE SOURCE OF WATER. SHOW THE |
| | SIZE, LOCATION OF METER, BACKFLOW PREVENTERS ON THE |
| | PLANS. (SECTIONS 90-32 AND 90-33 OF THE CODE OF |
| | ORDINANCES) |
| | |
| | 8. SUBMIT A HYDRAULIC ANALYSIS OF THE PROPOSED WATER |
| | DISTRIBUTION SYSTEM. |
| | |
| | 9. REVISE THE PLANS TO INCLUDE APPLICABLE CITY |
| | ENGINEERING STANDARD DETAILS. INDICATE THE YARD PIPING |
| | DESIGN STANDARDS (MINIMUM COVER, HORIZONTAL AND |
| | VERTICAL CLEARANCES), AND WHICH JOINTS ARE TO BE |
| | MECHANICALLY RESTRAINED. |
| | |
| | 10. INDICATE WHERE THE RUNOFF FROM THE ROOF DRAINS WILL |
| | BE DIRECTED. |
| | |
| | 11. THE SUBMITTED DESIGN PLANS WERE NOT SIGNED OR |
| | SEALED BY A LICENSED PROFESSIONAL (ARCHITECT, CIVIL |
| | ENGINEER, AND/OR LANDSCAPE ARCHITECT). PLEASE SUBMIT |
| | SIGNED AND SEALED PLANS. (FAC 61G15-23.002, FS 481.221 |
| | AND 481.321) |
| | |
| | 12. THE SUBMITTED PLAN SET WAS MISSING PAGES C-PGD 13, |
| | 14, AND 16 AS WELL AS PAGE YPP-21. |
| | |
| | KELLY CRANFORD, P.E. |
| | LAND DEVELOPMENT ENGINEER |
| | ENGINEERING & PUBLIC WORKS DEPARTMENT |
| | CITY OF WEST PALM BEACH |
| | [email protected] |
| | 561-494-1098 (OFFICE) |
| | |