| Date |
Text |
| 2014-09-18 11:10:36 | DATE: 9/18/2014 |
| | PROJECT: MALONE |
| | PERMIT#: 14080991 |
| | CODE: 2008 EDITION OF THE NEC |
| | 2010 EDITION OF THE FBC |
| | 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, |
| | ADMINISTRATION, 2012 FBC SUPPLEMENTS. |
| | |
| | 2ND ELECTRICAL PLAN REVIEW |
| | ACTION: DENIED |
| | |
| | 1)THE RISER DIAGRAM SUBMITTED INDICATES THE LOAD BEING |
| | FED FROM THE PHASE GENERATOR/MOTOR. THE MANUFACTURER |
| | DATA SHEETS SUBMITTED INDICATE THE LOAD BEING FED FROM |
| | THE PHASE CONVERTER. REVISE THE PLANS TO COINCIDE WITH |
| | THE MANUFACTURER DATA SHEETS PROVIDED AND THE NEC. |
| | |
| | 2) ACCORDING TO THE MANUFACTURER DATA SHEETS PROVIDED, |
| | THE MINIMUM WIRE SIZE TO THE PHASE GENERATOR/MOTOR IS A |
| | 1/0 AND THE PLAN INDICATES THE USE OF A #2. REVISE |
| | PLANS TO COINCIDE WITH THE MANUFACTURER DATA SHEETS |
| | PROVIDED AND THE NEC 430 |
| | |
| | 3) PROVIDE A LOAD CALCULATION FOR BOTH THE SINGLE PHASE |
| | AND 3 PHASE LOADS TO BE SERVED. INCLUDE IN THE SINGLE |
| | PHASE CALCULATION THE TOTAL CONNECTED LOAD OF THE |
| | BUILDING PLUS THE PROPOSED 3 PHASE CALCULATED LOAD. |
| | NEC215.5 |
| | |
| | 4) PROVIDE 3PHASE DISCONNECT AHEAD OF 3PHASE LOAD SIZED |
| | APPROPRIATELY TO PROTECT THE WIRE SIZE REQUIRED BASED |
| | ON THE TOTAL CALCULATED LOAD. NEC 430, 310.16 |
| | |
| | 5) VERIFY THE ELECTRICAL SERVICE DISCONNECTING MEANS |
| | HAS A FAULT CURRENT RATING THAT IS SUFFICIENT AT |
| | NOMINAL CIRCUIT VOLTAGE FOR THE CURRENT THAT MUST BE |
| | INTERRUPTED. PROVIDE A FAULT CURRENT CALCULATION. NEC |
| | 110.9 |
| | |
| | 6) THE #2/0 CU FEEDING THE PHASE CONVERTER FROM 200AMP |
| | MAIN 2 0F 2 IS UNDERSIZED FOR THE 200AMP MAIN. THE #8 |
| | CU GRD WIRE IS UNDERSIZED FOR THE 200AMP MAIN. NEC |
| | 310.16, 250.122 |
| | |
| | 7) PROVIDE THE LISTING ON THE PROPOSED NEW EQUIPMENT |
| | FROM AN APPROVED NATIONALLY RECOGNIZED TESTING |
| | LABORATORY. NEC 110.3 |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. SEE LINK: |
| | HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ |
| | 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF |
| | |
| | ADDITIONALLY, PLEASE INSERT CORRECTED PAGES INTO |
| | SUBMITTAL PACKAGE AND LEAVE THE PREVIOUSLY REVIEWED |
| | SHEETS FOR COMPARATIVE REVIEW. |
| | |
| | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |
| | 561-805-6717 OR [email protected] |
| | |