| Date |
Text |
| 2014-08-21 12:44:22 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | THE PROPOSED LOCATION OF THE TENT WAS NOT, IS NOT, |
| | DESIGNED FOR THIS TYPE OF OCCUPANCY OR STRUCTURE. |
| | |
| | IN THE EVENT OF AN EMERGENCY IN THE EXISTING BUILDING |
| | AND/OR IN THE PROPOSED TENT STRUCTURE, THE OCCUPANTS |
| | SHALL BE AFFORDED A CLEAR, SAFE EXIT PATH, EXIT DOOR |
| | AND EXIT DISCHARGE LEADING TO A PUBLIC WAY. |
| | |
| | NO EXITS, EXIT DISCHARGES, OR EMERGENCY LIGHTS ARE |
| | IDENTIFIED ON THE PLAN. THE WORD "DOOR" IS ON THE PLAN; |
| | HOWEVER, THE SIZE OF THE DOOR IS NOT INDICATED OR THE |
| | TYPE OF EXIT DOOR HARDWARE THAT IS REQUIRED FOR THIS |
| | ASSEMBLEY OCCUPANCY. |
| | |
| | NOT EXIT PATH LEADING TO A PUBLIC WAY FROM THE EXIT |
| | DISCHARGE (DOOR) IS NOT IDENTIFIED ON THE PLAN. |
| | |
| | A LIFE SAFETY PLAN, INCLUDING ALL EXITS, EXIT PATHS, |
| | CORRIDORS, EXIT DISCHARGES, OCCUPANCY LOADS, EMERGENCY |
| | LIGHTING SHALL BE PROVIDED. |
| | |
| | A COMPREHENSIVE LIFE SAFETY PLAN THAT INCLUDES THE |
| | EXISTING BUILDING'S OCCUPANY LOADS, EXIT PATHS, AND |
| | EXIT DISCHARGES OF THE SURROUNDING STRUCTURES, |
| | INCLUDING FENCING, MUST BE CONSIDERED, PLANNED FOR AND |
| | SUBMITTED FOR APPROVAL. |
| | |
| | THE SEATING PLAN IS NOT APPROVED AND MUST BE SUBMITTED |
| | SEPARATLY, INLUDING ALL DIMENSIONS BETWEEN CHAIRS AND |
| | TABLES AND ENSURING A CLEAR AND CONTINUOUS EXIT PATH |
| | LEADING TO AN EXIT. |