| Plan Review Notes For Permit 14070935 |
| Permit Number |
14070935 |
|
| Review Stop |
E |
| Sequence Number |
4 |
|
| Notes |
| Date |
Text |
| 2014-10-10 16:57:11 | 10/10/2014 | | | PROJECT: SFRTA GENERATOR / UPS | | | PERMIT#: | | | CODE: 2008 EDITION OF THE NEC | | | 2010 EDITION OF THE FBC | | | 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, | | | ADMINISTRATION, 2012 FBC SUPPLEMENTS. | | | | | | ELECTRICAL PLAN REVIEW | | | ACTION: NOTE | | | | | | 1) VERIFY THE LOAD AND CIRCUIT SIZE AT EQUIPMENT RACK | | | P1. THE PANEL SCHEDULE FOR PANEL UPS01 INDICATES A | | | 100AMP 3PHASE CIRCUIT BREAKER ON CIRCUIT #15,17,19 WITH | | | A 1.75 KW LOAD. THIS APPEARS TO BE AN OVERSIGHT ONLY TO | | | BE VERIFIED IN THE FIELD. | | | | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | | 561-805-6717 OR [email protected] | | | | | | | | | | | | |
|