2014-08-04 13:14:41DATE: 8/4/2014
 PROJECT:
 PERMIT#:
 CODE: 2008 EDITION OF THE NEC
 2010 EDITION OF THE FBC
 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1,
 ADMINISTRATION, 2012 FBC SUPPLEMENTS.
  
 1ST ELECTRICAL PLAN REVIEW
 ACTION: DENIED
  
 NOTE: CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT
 CLARITY TO INDICATE THE LOCATION, NATURE AND EXTENT OF
 THE WORK PROPOSED AND SHOW IN DETAIL THAT IT WILL
 CONFORM TO THE PROVISIONS OF THIS CODE AND RELEVANT
 LAWS, ORDINANCES, RULES AND REGULATIONS, AS DETERMINED
 BY THE BUILDING OFFICIAL. FBC 107.2.1 PLANS ARE TOO
 SMALL TO BE LEGIBLE. PROVIDE ENLARGED PLANS WITH
 ADDITIONAL DETAIL. ONLY ONE SET OF PLANS WAS SUBMITTED.
 TWO SETS ARE REQUIRED. ONE SET TO BE KEPT AS A FILE
 COPY AND ONE SET FOR THE APPLICANT. SEE NOTES BELOW FOR
 ADDITIONAL DETAIL REQUIRED:
  
 SHEET E-01. CLARIFICATION REQUIRED. FBC WPB AMENDMENTS.
 107.3.2
  
 1) NOTE 6 CALL OUT A 400AMP ENCLOSED CIRCUIT BREAKER
 BUT THE LINE DIAGRAM INDICATES VIA NOTE 8 THAT THE
 WIRING FROM THE LOAD SIDE IS UNDERSIZED. IF THIS IS
 INFACT A LOAD CENTER AND NOT AN ENCLOSED CIRCUIT
 BREAKER PLEASE REVISE PLANS AND NOTES TO REFLECT A CODE
 COMPLIANT INSTLATION.
 2) A PANEL SCHEDULE IS NEEDED FOR PANEL "A" NOTE 10
 REFERS TO "SEE SCHEDULE" SCHEDULE IS REQUIRED TO
 INDICATE CIRCUITS TO A/C CU, WALL MOUNTED A/C UNIT. AND
 UPS.
 3) A LOAD CALCULATION IS REQUIRED TO DETERMINE THE
 TOTAL CONNECTED LOAD AT THE SERVICE.
 4) PANEL A-1 APPEARS NEW BY WAY OF THE SOLID BLACK LINE
 IT IS DRAWN IN WITH. NO NOTES OR SCEDULES ASSOCIATED
 WITH PANEL "A-1" EXPLAIN.
 5) SFRTA WPB UPS01 SCHEDULE HAS CONFLICTING
 INFORMATION. BY IT'S TITLE IT IS A 120V 100AMP MAIN
 BREAKER PANEL. HOWEVER IF YOU LOOK AT THE BUSS
 ARRANGEMENT IT APPEARS TO BE FED BY A 3PHASE 400AMP
 MAIN BREAKER. THERE ARE CIRCUITS IN THIS PANEL THAT ARE
 IDENTIFIED TO FEED THE EQUIPMENT RACK P1. THESE ARE
 3PHASE RECEPTACLES ACCORDING TO THE INFORMATION ON
 SHEET E-03.
  
 SHEET E-02
  
 1) SEVERAL DETAILS ARE MISSING FROM THE "ONE LINE
 DIAGRAM". ADDITIONAL INFORMATION REQUIRED.
 1A. SYSTEM OPERATING VOLTAGE.
 1B. A FEEDER SCHEDULE INDICATING THE WIRE SIZES
 1C. A GROUNDING DETAIL.
  
 2) PROVIDE MANUFACTURER EQUIPMENT SPECIFICATIONS ON
 GENERATOR AND UPS
 3) PROVIDE SEPARATE PLANS AND SPECIFICATIONS ON
 CONCRETE SLAB
 4) PROVIDE A LOAD CALCULATION FOR THE TOTAL CONNECTED
 LOAD PROPOSED ON THE GENERATOR. SEE NEC 702.5 CAPACITY
 AND RATING BELOW:
 (A) AVAILABLE SHORT-CIRCUIT CURRENT. OPTIONAL STANDBY
 SYSTEM EQUIPMENT SHALL BE SUITABLE FOR THE MAXIMUM
 AVAILABLE SHORT-CIRCUIT CURRENT AT ITS TERMINALS.
 (B) SYSTEM CAPACITY. THE CALCULATIONS OF LOAD ON THE
 STANDBY SOURCE SHALL BE MADE IN ACCORDANCE WITH ARTICLE
 220 OR BY ANOTHER APPROVED METHOD.
 AUTOMATIC TRANSFER EQUIPMENT. WHERE AUTOMATIC TRANSFER
 EQUIPMENT IS USED, AN OPTIONAL STANDBY SYSTEM SHALL
 COMPLY WITH (2)(A) OR (2)(B).
 (A) FULL LOAD. THE STANDBY SOURCE SHALL BE CAPABLE OF
 SUPPLYING THE FULL LOAD THAT IS TRANSFERRED BY THE
 AUTOMATIC TRANSFER EQUIPMENT.
 (B) LOAD MANAGEMENT. WHERE A SYSTEM IS EMPLOYED THAT
 WILL AUTOMATICALLY MANAGE THE CONNECTED LOAD, THE
 STANDBY SOURCE SHALL HAVE A CAPACITY SUFFICIENT TO
 SUPPLY THE MAXIMUM LOAD THAT WILL BE CONNECTED BY THE
 LOAD MANAGEMENT SYSTEM.
  
 SHEET E-03
 1) A REVISED PANEL SCHEDULE IS REQUIRED TO IDENTIFY THE
 CIRCUITRY TO EACH OF THE NEW OUTLETS.
 2) IDENTIFY FM 200
 3) PROVIDE MANUFACTURER'S EQUIPMENT SPECIFICATIONS ON
 THE A/C WALL UNIT.
 4) PROVIDE EQUIPMENT AND MOUNTING DETAIL SPECIFICATIONS
 ON GPS ANTENNA.
 5) PROVIDE MANUFACTURERS EQUIPMENT SPECIFICATIONS ON
 THE UPS AND BATTERY CABINETS INCLUDING BATTERIES
 MOUNTING CONNECTION AND VENTLIATION DETAILS.
  
 FIRE SUPRESSION PLANS.
 1) MANUFACTURER EQUIPMENT SUBMITTALS REQUIRED FOR
 ENTIRE SYSTEM INCLUDING ALL COMPONENTS.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. SEE LINK: HTTP://WPB.ORG/DEVELOPMENT
 /WP-CONTENT/UPLOADS/SITES/33/2013/09/APPLICATION_RESUBM
 ITTAL_FORM_04132010.PDF
  
 ADDITIONALLY, PLEASE INSERT CORRECTED PAGES INTO
 SUBMITTAL PACKAGE AND LEAVE THE PREVIOUSLY REVIEWED
 SHEETS FOR COMPARATIVE REVIEW.
 DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421,
 561-805-6717 OR [email protected]
  