| 2014-07-31 14:56:02 | RESIDENTIAL (R3) ALTERATION, BUILDING REVIEW COMMENTS. |
| | CODE: 2010 FBC. |
| | |
| | 1- VALUATION DECLARED IN THE PERMIT APPLICATION IS TOO |
| | LOW. SEC. 109.3 CITY AMENDMENTS TO FBC. VALUATION TO |
| | INCLUDE ALL LABOR, MATERIALS AND CONTRACTOR'S OVERHEAD |
| | AND PROFIT. UPDATE VALUATION AS REQUIRED. |
| | |
| | 2- PROVIDE ACCORDION SHUTTERS COMPLETE INSTALLATION |
| | SCHEDULE. INSTALLATION SCHEDULE SUBMITTED IS |
| | INCOMPLETE. NEED TO FILL THE INFORMATION IN ALL THE |
| | COLUMNS TO VERIFY COMPLIANCE WITH THE DESIGN PRESSURES |
| | OF SEC. R301 OF 2010 FBC-RESIDENTIAL. |
| | |
| | 3- PAGE 14 OF 16 OF ACCORDION SHUTTERS DRAWINGS |
| | SUBMITTED ARE FOR DETAIL 10T TOP INSTALLATION AND |
| | DETAIL 10B BOTTOM INSTALLATION. CLARIFY HOW INSTALLING |
| | THE ACCORDION SHUTTERS PER DETAIL 10T TOP INSTALLATION. |
| | WHERE IS THE 1/8" X 4" ALUMINUM PLATE ATTACHED TO?. |
| | ACCORDING TO ELEVATIONS SUBMITTED, THERE ARE NOT |
| | CONDITIONS SHOWING A 10T TYPE OF INSTALLATION. REVISE |
| | AS REQUIRED. SEC. 107.2.1 CITY AMENDMENTS TO FBC. |
| | |
| | 4-PERMIT APPLICATION CALL S FOR "INSTALL SHUTTERS (AND |
| | REMOVABLE)" . PLEASE CLARIFY HOW ACHIEVING THIS. |
| | ACCORDION SHUTTERS ARE TYPICALLY PERMANENT |
| | INSTALLATION. SEC. 107.2.1 CITY AMENDMENTS TO FBC. |
| | ***NOTE: IF REMOVABLE PANELS ARE GOING TO BE INSTALLED, |
| | THEN PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY |
| | DCA RULE 9N-3. AND, PROVIDE COMPLETE INSTALLATION |
| | SCHEDULE. SEC. 107.2.1 CITY AMENDMENTS TO FBC. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | (561)805-6712 |
| | [email protected] |