| Plan Review Notes For Permit 14070538 |
| Permit Number |
14070538 |
|
| Review Stop |
M |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2014-11-06 08:30:24 | PLAN REVIEW COMMENTS | | | | | | 3RD REVIEW: FBC 2010 | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | MECHANICAL | | | | | | THE ENERGY CALCULATION FORM CONTAINS SOME DISCREPANCIES | | | THAT NEED TO BE CORRECTED. | | | 1) FOR ITEM #3 THE NUMBER OF UNITS SHOULD BE 2. FBC | | | 107.2.1 | | | 2) THE EQUIPMENT SIZING CALCULATIONS HAVE A TOTAL | | | COOLING LOAD OF 17,198 BTUH. FBC ENERGY CONSERVATION | | | SECTION 403.6.1.1 STATES THAT THE COOLING EQUIPMENT CAN | | | NOT BE MORE THAN 1.15 TIMES GREATER THAN THE TOTAL | | | CALCULATED LOAD. THE 24,000 BTU/HR SPECIFIED ON THE | | | ENERGY FORM IS MORE THAN 1.15 TIMES 17,198 BTUH. | | | THEREFORE, ITEM #12 SHOULD BE 18 BTUH. | | | 3) THE FORM SPECIFIES A 16.00 SEER FOR THE COOLING | | | EQUIPMENT AND THE PAPERWORK THAT WAS SUBMITTED FOR THE | | | GOODMAN EQUIPMENT INDICATES THAT IT HAS A SEER OF | | | 13.00. PLEASE CORRECT. FBC 107.2.1 |
|