2014-07-14 08:24:56DATE: 7/11/2014
 PROJECT: PBL
 PERMIT#: 14070342
 CODE: 2008 EDITION OF THE NEC
 2010 EDITION OF THE FBC
 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1,
 ADMINISTRATION, 2012 FBC SUPPLEMENTS.
  
 1ST ELECTRICAL PLAN REVIEW
 ACTION: PROVISO
  
 1) W/P BOOT REQUIRED AT ROOF PENETRATION FOR THE
 SERVICE RISER.
  
 2) SERVICE ENTRANCE REQUIRES THE TWO HOTS AND ONE
 GROUNDED (NEUTRAL) CONDUCTOR ONLY. NO EQUIPMENT GROUND
 CONDUCTOR REQUIRED AT THE POINT OF SERVICE ENTRANCE.
 THE GROUNDED (NEUTRAL) CONDUCTOR SERVES AS YOUR
 EQUIPMENT GROUND TO THE NEUTRAL TERMINAL WHERE THE MAIN
 BONDING JUMPER IS INSTALLED.
  
 3) IF A PVC NIPPLE IS USED NO MEG (BONDING) BUSHING
 REQUIRED. IT IS BEST TO NOTE ON THE PLANS WHICH
 MATERIAL IS PROPOSED.
  
 4) THE CONDUCTOR MATERIAL IS NOT NOTED ON THE PLANS.
 THE SERVICE RISER CALLS FOR A 150AMP MAIN. THE
 CONDUCTOR USED MUST MEET THE MINIMUM AMPS OF THE OCPD
 AT THE MAIN. WITHOUT NOTING THE CONDUCTOR MATERIAL THE
 MAX AMPACITY OF THE CONDUCTOR IS UNKNOWN. IT IS BEST TO
 NOTE THIS ON THE PLAN TO HELP EXPEDITE PLAN REVIEW AND
 TO HELP THE FIELD INSPECTOR COMPLETE YOUR INSPECTION
 WITH A POSITIVE OUTCOME.
  
 5) THE LOCATION OF THE MAIN IS IMPORTANT TO NOTE ON
 YOUR PLAN. THERE IS NO WAY FOR YOUR PLAN REVIEWER OR
 INSPECTOR TO KNOW THE LOCATION BASED ON THE PLANS
 PROVIDED. IT MUST BE INSTALLED AS CLOSE AS IS
 PRACTICABLE TO THE SERVICE ENTRANCE.
  
 6) AN INTER-SYSTEM BONDING STRIP IS REQUIRED AT THE
 MAIN SERVICE GROUND. NEC 250.94
  