| 2015-05-11 18:50:46 | PLAN REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC 2010 |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) DOOR #5 IN THE SCHEDULE ON SHEET 3.0 WHICH SEPARATES |
| | THE GARAGE FROM THE SECOND FLOOR IS REQUIRED TO COMPLY |
| | WITH FBC-R302.5.1 |
| | |
| | 2) THE PRODUCT APPROVAL REQUIRES THE RAS 117 |
| | CALCULATIONS TO BE SIGNED AND SEALED BY A FLORIDA |
| | LICENSED ENGINEER, ARCHITECT OR CERTIFIED ROOFING |
| | CONSULTANT. SPECIFY WHICH ONE OF THE APPROVED ROOFING |
| | ASSEMBLIES LISTED IN THE PRODUCT APPROVAL FOR GAF |
| | MODIFIED ROOFING SYSTEM (NOA NO. 14-0102.12) WILL BE |
| | INSTALLED. IDENTIFY THE ANCHORING AND DESIGN PRESSURES |
| | FOR THE SELECTED ASSEMBLY. SUBMIT TWO SETS OF SIGNED |
| | AND SEALED RAS 117 CALCULATIONS FOR ENHANCED FASTENING |
| | IF THE DESIGN PRESSURES ARE LESS THAN REQUIRED. |
| | |
| | 3) SUBMIT 2 COPIES OF PRODUCT APPROVALS, KEY PLANS AND |
| | INSTALLATION SCHEDULES FOR THE IMPACT PROTECTION |
| | DEVICES THAT ARE REQUIRED FOR THE NON-IMPACT RATED |
| | SLIDING GLASS DOORS (NOA NO. 11-1201.03). DCA RULE 9N-3 |
| | AND FBC 107.2.1 |
| | |
| | 4) THE PRODUCT APPROVAL SUBMITTED FOR THE LARGE MISSILE |
| | IMPACT RATED SINGLE HUNG WINDOWS HAS INSTALLATION |
| | DRAWINGS FOR WINDOWS WITH NO IMPACT RATING. THE FL |
| | NUMBER WRITTEN ON THE SUBMITTAL IS INCORRECT. IT IS |
| | MISSING A NUMBER AND SHOULD BE FL 14462. PLEASE |
| | CORRECT. |
| | |
| | 5) THE INSTALLATION SCHEDULE THAT WAS SUBMITTED FOR THE |
| | STEEL STORM PANELS HAS THE GLASS SEPARATION INCORRECTLY |
| | SPECIFIED AS 3". SEE TABLE 2 ON SHEET 4 OF 4. FOR |
| | SYSTEM 3 WITH A PANEL LENGTH OF UP TO 8'-8" AND A |
| | POSITIVE PRESSURE OF UP TO 50 PSF, THE MINIMUM GLASS |
| | SEPARATION IS 3.5". PLEASE CORRECT. |
| | |
| | |