| Plan Review Notes For Permit 14070100 |
| Permit Number |
14070100 |
|
| Review Stop |
ENG |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2014-08-29 15:41:21 | APPROVED AS-NOTED | | | | | | 1. STRIPING MUST BE AS PER CITY OF WPB ZLDR (DOUBLE | | | STRIPE AND MUST MEET MINIMUM DIMENSIONS) | | | | | | 2. CONTRACTOR SHALL HAVE ON-SITE AN ACTIVE POLLUTION | | | PREVENTION PLAN, ALL CATCH BASINS AND/OR DRAINAGE | | | ELEMENTS MUST BE PROTECTED AT ALL TIMES. | | | | | | 3. DUMPSTERS AND ADA PARKING AREAS AND ADA VENUES MUST | | | BE MADE ACCESSIBLE TO RESIDENTS WITH DISABILITIES. | | | | | | 4. CONTRACTOR SHALL COORDINATE AND INFORM ALL RESIDENTS | | | OF WHEN WORK AREAS WILL BE OCCUPIED. THERE SHALL BE | | | COORDINATION AS TO ALLOW EMERGENCY VEHICLES TO PROPERLY | | | REACH ALL AREAS OF THE SITE. | | | | | | 5. ENGINEER OF RECORD WILL CERTIFY WORK TO THE CITY. | | | | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | | | | | | | |
|