| Date |
Text |
| 2014-07-16 14:59:26 | DATE: 7/14/2014 |
| | PROJECT: PALM BEACH SPORTS MEDICINE MRI REPLACEMENT. |
| | PERMIT#: 14061244 |
| | CODE: 2008 EDITION OF THE NEC |
| | 2010 EDITION OF THE FBC |
| | 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, |
| | ADMINISTRATION, 2012 FBC SUPPLEMENTS. |
| | |
| | 1ST ELECTRICAL PLAN REVIEW |
| | ACTION: DENIED |
| | |
| | CLARIFICATION REQUIRED: |
| | |
| | 1) THE GE HEALTHCARE ELECTRICAL PLANS ARE NOT SIGNED |
| | AND SEALED. ALL INFORMATION, DRAWINGS, SPECIFICATIONS |
| | AND ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE |
| | OF THE PERSON RESPONSIBLE FOR THE DESIGN.WPB AMENDMENTS |
| | TO THE FBC 107.2.1 |
| | |
| | 2) PROVIDE AND INDICATE ON PLANS A COMPLETE FLOOR PLAN, |
| | RISER DIAGRAM, LOAD CALCULATION, AND PANEL SCHEDULES |
| | INDICATING ALL CIRCUITRY WITH WIRE SIZES WITH OVER |
| | CURRENT PROTECTION FOR ALL MAINS, PANELS AND BRANCH |
| | CIRCUITS. FBC 107.2.1, NEC 220.12, 220.14, 230.31 |
| | |
| | 3) PROVIDE AND INDICATE ON PLANS THE SAFETY LABELING |
| | REQUIRED FOR ARC FLASH PROTECTION FOR THE SERVICE, |
| | PANEL BOARDS AND MAIN DISCONNECTING MEANS. NEC 110.22, |
| | 110.16, 110.22 |
| | |
| | 4) PROVIDE AND INDICATE ON PLANS THE DISCONNECTING |
| | MEANS REQUIRED FOR NEW CHILLER SIZED PER NAMEPLATE. THE |
| | PROVISIONS OF PART II ARE INTENDED TO REQUIRE |
| | DISCONNECTING MEANS CAPABLE OF DISCONNECTING |
| | AIRCONDITIONING AND REFRIGERATING EQUIPMENT, INCLUDING |
| | MOTORCOMPRESSORS AND CONTROLLERS FROM THE CIRCUIT |
| | CONDUCTORS. 440.11, 440.12 |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. SEE LINK: HTTP://WPB.ORG/DEVELOPMENT |
| | /WPCONTENT/UPLOADS/SITES/33/2013/09/APPLICATION_RESUBMI |
| | TTAL_FORM_04132010.PDF. |
| | ADDITIONALLY, INSERT CORRECTED PAGES INTO SUBMITTAL AND |
| | LEAVE THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |
| | 561-805-6717 OR [email protected] |
| | |