| Date |
Text |
| 2016-04-10 08:44:36 | GAS REVIEW |
| | |
| | 1) SUBMIT THE SPECIFICATIONS/INSTALL MANUALS FOR POWER |
| | VENTS FOR THE GAS WATER HEATERS.FBC 107.1. |
| | 2) SHT. P 402 - SUBMIT AN EXPLANATION AS TO HOW THE |
| | CALCULATIONS FOR THE COMBUSTION AIR FOR THE GA WATER |
| | HEATERS WAS DONE.THERE IS A REFERENCE TO SEC. 706 OF |
| | THE FBC-MECHANICAL CODE. THIS CODE SECTION SPECIFICALLY |
| | STATES THAT THE CODE SECTION DOES NOT APPLY TO DIRECT |
| | VENT APPLIANCES. SEC. 304.1 OF THE FBC- FUEL GAS STATES |
| | THAT DIRECT VENT APPLIANCES SHALL BE PROVIDED WITH |
| | COMBUSTION, VENTILATION AND DILUTION AIR IN ACCORDANCE |
| | WITH THE APPLIANCE MANUFACTURER'S INSTRUCTIONS. SUBMIT |
| | A COPY OF THE INSTALL DOCUMENT FOR REVIEW. |
| | 3) IDENTIFY THE GAS VENTS ON THE ROOF PLAN ( IF THAT'S |
| | WHERE THEY WILL TERMINATE). |
| | 4) SUBMIT A DETAIL SHOWING THE TERMINATION POINT OF THE |
| | GAS VENTS, HEIGHT ABOVE ROOF, ETC.FGC SECS. 502 THRU |
| | 505. |
| | 5) SHT. P 301 - THE LENGTH OF THE GAS LINE IS SHOWN AS |
| | 150 FT.AND ON SHT. P 310 IT IS SHOWN AS 81 FT. CLARIFY. |
| | 6) SHT.P 310 - SEDIMENT TRAPS ARE REQUIRED ON THE WATER |
| | HEATER GAS PIPING TO EACH GAS HEATER. 2010 FGC |
| | SEC.408.4. |
| | 7) SHT. P 310 SHOWS THE BTU LOAD OF THE GAS SYSTEM AS |
| | 1,200,000 BTU'S AND SHT. P 402 , GAS WATER HEATER |
| | SCHEDULE SHOWS THE LOAD AS 500,000 BTU'S EACH. CLARIFY. |
| | 8) SHT.P 310 - PROVIDE A DETAIL AS TO HOW THE GAS |
| | PIPING IS ENTERING THE STRUCTURE. THE PLANS ARE VAGUE. |
| | GAS PIPING SHALL NOT PENETRATE THE BUILDING FOUNDATION |
| | WALLS AT ANY POINT BELOW GRADE. SCHEDULE 40 METALLIC |
| | PIPE IS NOT PERMITTED BELOW GROUND UNLESS PROTECTED IN |
| | ACORDANCE WITH SECS.404.9 THROUGH 404.9.2. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |