| Date |
Text |
| 2016-03-24 09:32:52 | BUILDING PLAN REVIEW |
| | PERMIT: 14061217 |
| | ADD: 335 CLEMATIS ST |
| | CONT: TBD |
| | TEL: (561)856-6655/ NEYITA |
| | |
| | 2010 FLORIDA BUILDING CODE W |
| | * 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA |
| | BUILDING CODE, CHAPTER 1, ADMINISTRATION, 2010 EDITION |
| | 2012 FBC SUPPLEMENTS ADOPTED APRIL 25/2013. |
| | |
| | 3RD REVIEW |
| | DATE: TUES. MARCH 22/ 2016 |
| | ACTION: DENIED |
| | |
| | 1) PROVISO: THE SURVEY INDICATES THE PROPOSED BUILDING |
| | WILL PROVIDE A REPLAT BEFORE PERMIT ISSUANCE. |
| | |
| | 2) THRESHOLD BUILDINGS. |
| | |
| | 2A) COMPLIED, 109.3.6.1 SUBMITTED A WRITTEN THRESHOLD |
| | PLAN. |
| | |
| | 2B) COMPLIED. |
| | |
| | 2C) 3RD REQUEST. THRESHOLD INSPECTOR: WPB AMENDMENT |
| | 109.3.6.2 W.P.B. CONSTRUCTION SERVICES DEPARTMENT |
| | REQUEST FOR THRESHOLD BUILDINGS A SPECIAL INSPECTOR AS |
| | REQUIRED BY FL S S 553.79(5) FLORIDA STATUTES TO THE |
| | MINIMUM INSPECTIONS REQUIRED BY THIS CODE. THE |
| | THRESHOLD AGREEMENT FORMS MUST BE SIGNED BY ALL |
| | INTERESTED PARTIES AND RETURNED TO THE BUILDING |
| | DEPARTMENT BEFORE PERMIT ISSUANCE. . CONTACT KEN CONRAD |
| | MANAGER OF THE SPECIAL INSPECTOR PROGRAM AT |
| | (561)805-6666 OR E-MAIL: [email protected] FOR FURTHER |
| | INFORMATION. |
| | |
| | 2D) 3RD REQUEST. FOR THE SPECIAL INSPECTOR PLEASE |
| | PROVIDE A RESUME' OF INSPECTION EXPERIENCE ON PREVIOUS |
| | PROJECT. THE RESUME' MUST BE ACCOMPANIED BY ALL |
| | CERTIFICATES AS SPECIFIED HEREIN. THE BUILDING OFFICIAL |
| | OR HIS DESIGNEE WILL REVIEW THE RESUME'. AFTER THE |
| | RESUME' IS REVIEWED, AN INTERVIEW WILL BE REQUIRED. |
| | |
| | 2E) 3RD REQUEST. THE CONTRACTOR OF RECORD WILL PRODUCE |
| | A JOB SUMMARY OR HISTORY FOR THIS TYPE OF CONSTRUCTION. |
| | THIS MAY BE SUBMITTED TO KEN CONRAD BY E-MAIL. KEN |
| | CONRAD: [email protected] |
| | |
| | 2F) NOTICE ONLY, NO ACTION REQUIRED BY ARCHITECT. |
| | PLEASE CALL THE CITY OF WEST PALM BEACHES? AUTOMATED |
| | TELEPHONE INSPECTIONS LINE (561) 805-6700) FOR |
| | IN-PROGRESS INSPECTIONS FOR AUDITING OF JOBSITE |
| | INSPECTIONS. |
| | |
| | 2G) NOTICE ONLY, NO ACTION REQUIRED BY ARCHITECT. |
| | 109.3.6 THRESHOLD BUILDINGS, OPERATING GUIDELINES FOR |
| | THRESHOLD INSPECTORS #26. ASSURE THAT THE DESIGNER HAS |
| | REQUIRED ON THE PLANS OR SPECIFICATIONS ONE MATERIAL, |
| | APPROVED FOR FIRE STOPPING PENETRATIONS, FOR WALLS AND |
| | CEILINGS. |
| | |
| | 3-4) COMPLIED. |
| | |
| | 5) 3RD REQUEST. ONLY ONE SIGNED & SEALED SOILS REPORT |
| | SUBMITTED THIS REVIEW, 2 ADDITIONAL SIGNED & SEALED |
| | ORIGINAL REPORTS ARE STILL REQUIRED. ARDAMAN & |
| | ASSOCIATES SUBSURFACE AND GEOTECHNICAL ENGINEERING |
| | EVALUATION REPORT DATED MAY 14/ 2014. |
| | 5A) THE GEOTECHNICAL REPORT RECOMMENDS THE 14 INCH |
| | DIAMETER AUGER CAST PILE BE DRILLED TO A DEPTH OF 48 |
| | FEET. THE 2010 FBC-B 1810. 3.5.2.2 UNCASED CAST IN |
| | PLACE DEEP FOUNDATIONS THE LENGTH SHALL NOT EXCEED 30 |
| | TIMES THE AVERAGE DIAMETER OR APPROXIMATELY 35 FEET. |
| | THE EXCEPTION: THE LENGTH OF THE ELEMENT IS PERMITTED |
| | TO EXCEED 30 TIMES THE DIAMETER, PROVIDED THE DESIGN |
| | AND INSTALLATION OF THE DEEP FOUNDATIONS ARE UNDER THE |
| | DIRECT SUPERVISION OF A REGISTERED DESIGN PROFESSIONAL |
| | KNOWLEDGEABLE IN THE FIELD OF SOIL MECHANICS AND DEEP |
| | FOUNDATIONS. THE REGISTERED DESIGN PROFESSIONAL SHALL |
| | SUBMIT A REPORT TO THE BUILDING OFFICIAL STATING THAT |
| | THE ELEMENTS WERE INSTALLED IN COMPLIANCE WITH THE |
| | APPROVED CONSTRUCTION DOCUMENTS. |
| | |
| | 5B) PLEASE PROVIDE WHAT GEOTECHNICAL ENGINEER WILL BE |
| | SUPERVISING AND MONITORING THE INSTALLATION OF THE |
| | AUGER CAST TEST PILE AS WELL AS THE PRODUCTION PILE. |
| | 107.2.1.3 ADDITIONAL INFORMATION REQUIRED. |
| | |
| | 5C) WILL THERE BE A SPECIALTY PILE CONTRACTOR |
| | INSTALLING THE 14 INCH DIAMETER AUGER CAST PILE. THE |
| | PILE CONTRACTOR SHOULD BE RESPONSIBLE FOR DESIGNING, |
| | AND INSTALLING THE TEST ASSEMBLY AND PROVIDE A RECENTLY |
| | CALIBRATED HYDRAULIC JACK. THE CONTRACTOR?S DESIGN AND |
| | CALIBRATION OF THE TEST EQUIPMENT SHALL BE SUBMITTED TO |
| | THE GEOTECHNICAL ENGINEER FOR REVIEW AND APPROVAL. |
| | |
| | |
| | |
| | |
| | |
| | 6) COMPLIED. |
| | |
| | 7) SHEET A1.00 LIFE SAFETY SHEET: |
| | 7A-F) COMPLIED. |
| | |
| | 7G) PROVISO: APPROVED BY FIRE CHIEF PROVIDED THAT THE |
| | EQUIPMENT FITS DOES NOT MEET THE SIZE REQUIREMENTS OF |
| | 911.1.3.THE LIFE SAFETY SHEET LEVEL 1 DOES NOT INDICATE |
| | COMPLIANCE WITH [F] 403.4.5 FIRE COMMAND. A FIRE |
| | COMMAND CENTER COMPLYING WITH SECTION 911 SHALL BE |
| | PROVIDED IN A LOCATION APPROVED BY THE FIRE DEPARTMENT. |
| | |
| | 7H-O) COMPLIED. |
| | |
| | |
| | 7P)PROVISO, COMPLIED REPEAT 7G. |
| | |
| | 7Q)3RD REQUEST. 2010FBC-B MISSING INFORMATION: 403.6 |
| | ELEVATORS. ELEVATOR INSTALLATION AND OPERATION IN |
| | HIGH-RISE BUILDINGS SHALL COMPLY WITH CHAPTER 30 AND |
| | SECTIONS 403.6.1 AND 403.6.2. |
| | |
| | 403.6.1 FIRE SERVICE ACCESS ELEVATOR. IN BUILDINGS WITH |
| | AN OCCUPIED FLOOR MORE THAN 120 FEET (36 576 MM) ABOVE |
| | THE LOWEST LEVEL OF FIRE DEPARTMENT VEHICLE ACCESS, A |
| | MINIMUM OF ONE FIRE SERVICE ACCESS ELEVATOR SHALL BE |
| | PROVIDED IN ACCORDANCE WITH SECTION 3007. |
| | |
| | 3007.4 FIRE SERVICE ACCESS ELEVATOR LOBBY. THE FIRE |
| | SERVICE ACCESS ELEVATOR SHALL OPEN INTO A FIRE SERVICE |
| | ACCESS ELEVATOR LOBBY IN ACCORDANCE WITH SECTIONS |
| | 3007.4.1 THROUGH 3007.4.4. |
| | |
| | EXCEPTION: WHERE A FIRE SERVICE ACCESS ELEVATOR HAS TWO |
| | ENTRANCES ONTO A FLOOR, THE SECOND ENTRANCE SHALL BE |
| | PERMITTED TO OPEN INTO AN ELEVATOR LOBBY IN ACCORDANCE |
| | WITH SECTION 708.14.1. |
| | |
| | 3RD REQUEST. 3007.4.1 ACCESS. THE FIRE SERVICE ACCESS |
| | ELEVATOR LOBBY SHALL HAVE DIRECT ACCESS TO AN EXIT |
| | ENCLOSURE. |
| | THE RESPONSE INDICATES THAT A MEETING IS REQUESTED. |
| | I?VE SPOKEN TO THE BUILDING OFFICIAL ABOUT THIS CODE |
| | ISSUE AND THE RESPONSE THAT IT WAS APPROVED BY CHIEF |
| | PETER LEDUC. THE CODE ARTICLE GIVEN IS NOT A NFPA BUT |
| | 2010 FLORIDA BUILDING CODE-BUILDING CODE SECTION. MR. |
| | BROWN REQUEST THAT THE ARCHITECT OF RECORD WRITE A |
| | LETTER ON THEIR LETTER HEAD THAT THEY RECEIVED APPROVAL |
| | FROM CHIEF PETER LEDUC, SIGN AND SEAL THE LETTER SO IT |
| | WILL BECOME PART OF THE PERMIT SET OF DOCUMENTS, (3) |
| | ORIGINALS TO GO WITH EACH SET OF PLANS. |
| | |
| | COMPLIED. 3007.4.2 LOBBY ENCLOSURE. |
| | THE FIRE SERVICE ACCESS ELEVATOR LOBBY SHALL BE |
| | ENCLOSED WITH A SMOKE BARRIER HAVING A MINIMUM 1-HOUR |
| | FIRE-RESISTANCE RATING, EXCEPT THAT LOBBY DOORWAYS |
| | SHALL COMPLY WITH SECTION 3007.4.3. |
| | |
| | COMPLIED. 3007.4.3 LOBBY DOORWAYS. EACH FIRE SERVICE |
| | ACCESS ELEVATOR LOBBY SHALL BE PROVIDED WITH A DOORWAY |
| | THAT IS PROTECTED WITH A 3/4-HOUR FIRE DOOR ASSEMBLY |
| | COMPLYING WITH SECTION 715.4. THE FIRE DOOR ASSEMBLY |
| | SHALL ALSO COMPLY WITH THE SMOKE AND DRAFT CONTROL DOOR |
| | ASSEMBLY REQUIREMENTS OF SECTION 715.4.3.1 WITH THE UL |
| | 1784 TEST CONDUCTED WITHOUT THE ARTIFICIAL BOTTOM SEAL. |
| | |
| | COMPLIED. PROVIDE THE SQUARE FOOTAGE OF THE FIRE |
| | SERVICE ELEVATOR LOBBY. 3007.4.4 LOBBY SIZE. EACH |
| | ENCLOSED FIRE SERVICE ACCESS ELEVATOR LOBBY SHALL BE A |
| | MINIMUM OF 150 SQUARE FEET (14 M2) IN AN AREA WITH A |
| | MINIMUM DIMENSION OF 8 FEET (2440 MM). |
| | |
| | 7R) COMPLIED. SHEET A8.00 WALL TYPES K-P DO NOT PROVIDE |
| | FIRE RATING OF WALL. |
| | |
| | 8-10) COMPLIED. |
| | |
| | 11) SHEET A2.03: |
| | 11A) THE PLANS SHOW A SHAFT BEGINNING ON THE 4TH FLOOR, |
| | THE SHEET A2.04-A2.10 SHOW THE SHAFT BUT THE WALL TAGS |
| | ARE MISSING FOR THE 2 HOUR FIRE RATING OF SHAFT. 2010 |
| | FBC-B 708.2 SHAFT REQUIRED. |
| | |
| | 12) SHEET A2.11: COMPLIED. |
| | |
| | 13A-D) BUILDING PROVISO: THE PRODUCT APPROVALS HAVE |
| | BEEN REQUESTED TO BE DEFERRED SUBMITTALS. 107.3.4.2 |
| | DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, |
| | DEFERRED SUBMITTALS ARE |
| | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT |
| | SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE |
| | TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |
| | PLEASE PROVIDE 3 SETS OF PRODUCT APPROVALS FOR EACH OF |
| | THE FOLLOWING COMPONENTS AND OR CLADDING IF SUBMITTING |
| | IN PAPER FORM. |
| | |
| | 13A) 2010 FBC-B 1609.1.2 PROTECTION OF OPENINGS, |
| | 1609.6.4.41 COMPONENTS & CLADDING |
| | FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV. |
| | 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION |
| | SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS: |
| | (31)(A) EXTERIOR DOORS. |
| | (B) WINDOWS |
| | (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL |
| | LOUVERS, EFIS SYSTEMS, |
| | (D) ROOFING PRODUCTS AND ASSEMBLIES & WATERPROOFING FOR |
| | SLABS |
| | (E) SHUTTERS |
| | (F) SKYLIGHTS |
| | (G) EXTERIOR COOLER, FREEZERS & PRE-ENGINEERED A/C |
| | STANDS |
| | |
| | 13B) FOR ALL PRODUCTS WITH GLAZING, PLEASE IDENTIFY THE |
| | OPENING WIDTH & HEIGHT, TYPE OF GLAZING, MULLION |
| | INFORMATION IF REQUIRED, ATTACHMENTS AND ASSOCIATE |
| | PRESSURES FOR EACH OPENING SIZE. |
| | |
| | 13C) FOR ALL ROOFING PRODUCTS PLEASE IDENTIFY ALL |
| | ROOFING SUB-SYSTEMS AND THEIR ASSOCIATED PRESSURES FOR |
| | ROOF ZONE # 1. REVIEW THE PRODUCT APPROVAL LIMITATIONS, |
| | IF ENHANCED FASTENING IS ALLOWED. IF SO RAS 117 |
| | CALCULATIONS ARE REQUIRED BY EITHER A FLORIDA ARCHITECT |
| | OR ENGINEER. |
| | |
| | 13D) FOR ALL ROOF TOP EQUIPMENT, CURBS OR A/C STANDS, |
| | DETAILED ATTACHMENT TO THE ROOF DECK AS WELL AS FROM |
| | THE CURB OR ROOF STAND TO THE EQUIPMENT ABOVE. 2014 |
| | FBC-B 1604.4 ANALYSIS. LOAD EFFECTS ON STRUCTURAL |
| | MEMBERS AND THEIR CONNECTIONS SHALL BE DETERMINED BY |
| | METHODS OF STRUCTURAL ANALYSIS THAT TAKE INTO ACCOUNT |
| | EQUILIBRIUM, GENERAL STABILITY, GEOMETRIC COMPATIBILITY |
| | AND BOTH SHORT- AND LONG-TERM MATERIAL PROPERTIES. |
| | EVERY STRUCTURE SHALL BE DESIGNED TO RESIST THE |
| | OVERTURNING EFFECTS CAUSED BY THE LATERAL FORCES |
| | SPECIFIED IN THIS CHAPTER. SEE SECTION 1609 FOR WIND |
| | LOADS? |
| | |
| | |
| | 14) BUILDING PROVISO: 2010 FBC 107.3.4.1 PRODUCT |
| | APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED BY THE |
| | DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN |
| | WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| | FOR JURISDICTIONAL APPROVAL. FL 61G1-23.015 (2) THE |
| | ARCHITECT IS RESPONSIBLE FOR SUPERVISING AND REVIEWING |
| | ALL PROJECT DATA, REPORTS, SHOP DRAWINGS ETC.. |
| | |
| | 15) COMPLIED WIND DESIGN CRITERIA.. |
| | |
| | 16-20) COMPLIED. |
| | |
| | 20A) PROVISO: PLEASE ALSO NOTE THE 3 RD. FLOOR IS TO BE |
| | DESIGNED FOR A FUTURE RESTAURANT, BE AWARE OF 1013.2 |
| | WHERE FIXED SEATING MAY BE A HEIGHT FACTOR IN THE GUARD |
| | RAIL PER 2010 FBC-B 1013.2.. |
| | |
| | 21) COMMENT # 5( A-C). SHEET S1 AND S11.1 BOTH INDICATE |
| | THE USE OF AUGER CAST PILE, PLEASE PROVIDE WHAT AGENCY/ |
| | INSPECTION SERVICE WILL BE RESPONSIBLE FOR THE |
| | OBSERVING & RECORD KEEPING OF THE AUGER CAST PILE AS |
| | WELL AS LOAD TESTING TO SECTION 2010 FBC-B |
| | 1810.3.3.1.2. |
| | |
| | 22A) SHEET M602 BUILDING PRESSURIZATION- CONTROL |
| | SEQUENCE. UNDER THE HEADING 2.2.2.(A) (3) INDICATE THE |
| | INSTALLATION OF FIRE SMOKE DAMPERS WHEREAS THE FLOOR |
| | PLANS ONLY SHOW A FIRE DAMPER AT THE CORRIDOR. |
| | GUESTROOM WALL? 107.2.1.3. DISCREPANCY IN PLANS. |
| | |
| | 22B) SHEET M602 BUILDING PRESSURIZATION- CONTROL |
| | SEQUENCE. UNDER THE HEADING 2.2.2.(C) THE PLANS |
| | INDICATE ONLY PRESSURIZING FLOORS 4 THROUGH 10. PLEASE |
| | EXPLAIN WHY THE 2ND AND 3RD FLOORS ARE NOT BEING |
| | PRESSURIZED? 909.6 PRESSURIZATION METHOD. THE PRIMARY |
| | MECHANICAL MEANS OF CONTROLLING SMOKE SHALL BE BY |
| | PRESSURE DIFFERENCES ACROSS SMOKE BARRIERS. MAINTENANCE |
| | OF A TENABLE ENVIRONMENT IS NOT REQUIRED IN THE SMOKE |
| | CONTROL ZONE OF FIRE ORIGIN. |
| | |
| | 22C) PLEASE PROVIDE COMPLIANCE WITH: FBC-B 909.4 |
| | ANALYSIS. A RATIONAL ANALYSIS SUPPORTING THE TYPES OF |
| | SMOKE CONTROL SYSTEMS TO BE EMPLOYED, THEIR METHODS OF |
| | OPERATION, THE SYSTEMS SUPPORTING THEM AND THE METHODS |
| | OF CONSTRUCTION TO BE UTILIZED SHALL ACCOMPANY THE |
| | SUBMITTED CONSTRUCTION DOCUMENTS AND SHALL INCLUDE, BUT |
| | NOT BE LIMITED TO, THE ITEMS INDICATED IN SECTIONS |
| | 909.4.1 THROUGH 909.4.6. |
| | |
| | 23) BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT |
| | FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL |
| | PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND |
| | A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT |
| | APPLICATION. PLEASE CALL (561)233-5025 FOR MORE |
| | INFORMATION. |
| | |
| | 24) WHEN RESUBMITTING PLANS PLEASE INDICATE THE |
| | REVISION & REMOVE & REPLACE ANY PAGES AS NECESSARY. A |
| | TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW COMMENT |
| | NUMBER, WITH A DESCRIPTION OF THE REVISION MADE, |
| | IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE THE |
| | CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR PERMIT. |
| | THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | JAMES A. WITMER CBO |
| | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER |
| | TEL: 561-805-6715 |
| | FAX: 561-805-6676 |
| | E-MAIL: [email protected] |
| | |
| | DEVELOPMENT SERVICES HOME PAGE |
| | HTTP://WWW.CITYOFWPB.COM/CONSTRUCTION/INDEX.PHP |
| | |
| | PLEASE NOTE: FLORIDA HAS A VERY BROAD PUBLIC RECORDS |
| | LAW. WRITTEN COMMUNICATIONS TO OR FROM LOCAL OFFICIALS |
| | REGARDING CITY BUSINESS ARE PUBLIC RECORD, AVAILABLE TO |
| | THE PUBLIC UPON REQUEST. YOUR E-MAIL COMMUNICATIONS ARE |
| | THEREFORE SUBJECT TO PUBLIC DISCLOSURE. |
| | |
| | MEMBER OF BOAF: BUILDING OFFICIALS ASSOCIATION OF |
| | FLORIDA SAVING LIVES AND PROPERTY SINCE 1953 |
| | |
| | |
| | |