| Date |
Text |
| 2014-10-11 09:14:27 | PLAN REVIEW COMMENTS |
| | |
| | |
| | 2ND REVIEW: FBC 2010 |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | MECHANICAL |
| | |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) THE ORIGINAL SUBMITTAL DID NOT INDICATE THAT ANY |
| | MECHANICAL WORK WAS TO BE DONE. THERE ARE HVAC LOAD |
| | CALCULATIONS IN THIS SUBMITTAL AND THE NEW DRAWINGS |
| | INDICATE THAT A NEW HVAC SYSTEM WILL BE INSTALLED. |
| | PLEASE CLARIFY. FBC 107.2.1 |
| | |
| | 2) THE COOLING AND HEATING BTUH ON THE ENERGY |
| | CALULATION FORM DOES NOT MATCH THE TOTAL HEATING AND |
| | COOLING |
| | 3) FBC-R - M1305.1.3 APPLIANCES IN ATTICS. |
| | ATTICS CONTAINING APPLIANCES SHALL BE PROVIDED WITH AN |
| | OPENING AND A CLEAR AND UNOBSTRUCTED PASSAGEWAY LARGE |
| | ENOUGH TO ALLOW REMOVAL OF THE LARGEST APPLIANCE, BUT |
| | NOT LESS THAN 30 INCHES (762 MM) HIGH AND 22 INCHES |
| | (559 MM) WIDE AND NOT MORE THAN 6 FEET (1829 MM) LONG |
| | MEASURED ALONG THE CENTERLINE OF THE PASSAGEWAY FROM |
| | THE OPENING TO THE APPLIANCE. THE PASSAGEWAY SHALL HAVE |
| | CONTINUOUS SOLID FLOORING IN ACCORDANCE WITH CHAPTER 5 |
| | NOT LESS THAN 24 INCHES (610 MM) WIDE. A LEVEL SERVICE |
| | SPACE AT LEAST 30 INCHES (762 MM) DEEP AND 30 INCHES |
| | (762 MM) WIDE SHALL BE PRESENT ALONG ALL SIDES OF THE |
| | APPLIANCE WHERE ACCESS IS REQUIRED. THE CLEAR ACCESS |
| | OPENING DIMENSIONS SHALL BE A MINIMUM OF 20 INCHES BY |
| | 30 INCHES (508 MM BY 762 MM), AND LARGE ENOUGH TO ALLOW |
| | REMOVAL OF THE LARGEST APPLIANCE. |
| | |
| | 4) FBC-R - M1305.1.3.1 ELECTRICAL REQUIREMENTS. |
| | A LUMINAIRE CONTROLLED BY A SWITCH LOCATED AT THE |
| | REQUIRED PASSAGEWAY OPENING AND A RECEPTACLE OUTLET |
| | SHALL BE INSTALLED AT OR NEAR THE APPLIANCE LOCATION IN |
| | ACCORDANCE WITH CHAPTER 34. |
| | |
| | 5) FBC-R - M1305.1.3.2 AIR-HANDLING UNITS. |
| | AIR-HANDLING UNITS SHALL BE ALLOWED IN ATTICS IF THE |
| | FOLLOWING CONDITIONS ARE MET: |
| | 1. THE SERVICE PANEL OF THE EQUIPMENT IS LOCATED WITHIN |
| | 6 FEET (1829 MM) OF AN ATTIC ACCESS. |
| | 2. A DEVICE IS INSTALLED TO ALERT THE OWNER OR SHUT THE |
| | UNIT DOWN WHEN THE CONDENSATION DRAIN IS NOT WORKING |
| | PROPERLY. |
| | 3. THE ATTIC ACCESS OPENING IS OF SUFFICIENT SIZE TO |
| | REPLACE THE AIR HANDLER. |
| | 4. A NOTICE IS POSTED ON THE ELECTRIC SERVICE PANEL |
| | INDICATING TO THE HOMEOWNER THAT THE AIR HANDLER IS |
| | LOCATED IN THE ATTIC. SAID NOTICE SHALL BE IN ALL |
| | CAPITALS, IN 16 POINT TYPE, WITH THE TITLE AND FIRST |
| | PARAGRAPH IN BOLD: |
| | |
| | 6) FBC -107.3.5.1.4 MECHANICAL MINIMUM PLAN REVIEW |
| | CRITERIA: SHOW, EXHAUST SYSTEMS, CLOTHES DRYER EXHAUST, |
| | KITCHEN EQUIPMENT EXHAUST, SPECIALTY EXHAUST SYSTEMS, |
| | EQUIPMENT, EQUIPMENT LOCATION, MAKE-UP AIR, |
| | ROOF-MOUNTED EQUIPMENT, DUCT SYSTEMS, VENTILATION, |
| | COMBUSTION AIR, CHIMNEYS, FIREPLACES AND VENTS, |
| | APPLIANCES, BOILERS, REFRIGERATION, BATHROOM |
| | VENTILATION, LABORATORY, DESIGN FLOOD ELEVATION. |
| | |
| | 7) FBC-R - M 1602.4 PROVIDE BALANCED AIR RETURN AT |
| | BEDROOMS. |
| | |
| | 8) FBC 107.2.1 PROVIDE THE MODEL NUMBERS AND |
| | SPECIFICATIONS OF THE HEATING AND COOLING EQUIPMENT IN |
| | AN EQUIPMENT SCHEDULE ON THE MECHANICAL PLAN THAT |
| | CORRESPONDS WITH THE EQUIPMENT SIZING CALCULATIONS. |
| | |
| | 9) FBC - 107.3.5.3 ? PROVIDE A MECHANICAL PLAN TO SHOW |
| | SUPPLY DUCTS PER FBC-R M16 & BATH EXHAUST PER FBC-R |
| | M15. |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |