| Plan Review Notes For Permit 14060331 |
| Permit Number |
14060331 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2014-06-10 08:43:47 | 2010 FBC | | | | | | DENIED BY BUILDING | | | | | | 1) THE ENGINEERING INDICATES THAT THIS HIGH RISE | | | STRUCTURE HAS A 4 : 12 ROOF SLOPE. IN THE AERIAL | | | PHOTOGRAPHS ON THE PROPERTY APPRAISER'S WEB SITE IT | | | APPEARS THAT THIS BUILDING HAS A 0 SLOPE ROOF. PLEASE | | | VERIFY. CITY AMENDMENTS 107.2.1 | | | | | | 2) ALL OF THE OPENINGS ARE SPECIFIED AS ZONE 4 ON THE | | | ENGINEERING. THE DRAWING THAT WAS SUBMITTED APPEARS TO | | | SHOW THAT AT LEAST PART OF SOME OF THE OPENINGS ARE | | | LOCATED IN WALL ZONE 5. PLEASE PROVIDE A DIAGRAM OF THE | | | BUILDING AND INDICATE THE LOCATION OF THIS UNIT. | | | | | | 3) NOA NO. 12-0410.19 FOR THE SERIES ML-100 ALUMINUM | | | TUB MULLIONS HAS BEEN SUPERSEDED. PLEASE SUBMIT THE | | | CURRENT PRODUCT APPROVAL. DCA RULE 9N-3 | | | | | | 4) PLEASE CLARIFY THE COMPONENT THAT IS LOCATED AT EACH | | | OPENING ON THE PLANS. FOR EXAMPLE OPENING NUMBERS 2, 3 | | | AND 4 APPEAR TO BE (4) PANEL SLIDING GLASS DOORS AND | | | OPENING NUMBER 1 APPEARS TO BE A (3) PANEL SLIDING | | | GLASS DOOR AS CIRCLED ON THE PRODUCT APPROVAL. HOWEVER, | | | I DO NOT KNOW WHAT COMPONENTS WILL BE IN OPENINGS 5 AND | | | 6. CITY AMENDMENTS 107.2.1 | | | | | | 5) PLEASE INDICATE WHERE THE TUBE MULLION IS TO BE | | | INSTALLED. INDICATE THE MULL SPAN AND OPENING SIZES ON | | | EACH SIDE ON THE MULLION. CITY AMENDMENTS 107.2.1 | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|