| 2014-07-10 15:03:04 | DATE: 7/9/2014 |
| | PROJECT: AMG PHILLIPS POINT EXPANSION |
| | PERMIT#: 14060196 |
| | CODE: 2008 EDITION OF THE NEC |
| | 2010 EDITION OF THE FBC |
| | 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, |
| | ADMINISTRATION, 2012 FBC SUPPLEMENTS. |
| | |
| | 1ST ELECTRICAL PLAN REVIEW |
| | ACTION: DENIED |
| | |
| | 1) BOXES, CONDUIT BODIES, AND HANDHOLE ENCLOSURES SHALL |
| | BE INSTALLED SO THAT THE WIRING CONTAINED IN THEM CAN |
| | BE RENDERED ACCESSIBLE WITHOUT REMOVING ANY PART OF THE |
| | BUILDING OR, IN UNDERGROUND CIRCUITS, WITHOUT |
| | EXCAVATING SIDEWALKS, PAVING, EARTH, OR OTHER SUBSTANCE |
| | THAT IS TO BE USED TO ESTABLISH THE FINISHED GRADE. NEC |
| | 314.29. THE POWER PACKS FOR MOTION SENSORS APPEAR TO BE |
| | LOCATED IN AREAS WITH DRYWALL CEILINGS. ALL |
| | TRANSFORMERS, LED DRIVERS JUNCTION BOXES, POWER PACK |
| | AND THE LIKE SHALL BE INSTALLED SO AS TO REMAIN |
| | ACCESSIBLE AFTER INSTALLATION AND CONSTRUCTION IS |
| | COMPLETE. |
| | |
| | 2) PROVIDE PRODUCT APPROVALS FOR ALL FIXTURES. LISTING |
| | AND LABELING REQUIRED BY AN APPROVED TESTING LAB. IN |
| | JUDGING EQUIPMENT, CONSIDERATION SUCH AS THE FOLLOWING |
| | SHALL BE EVALUATED: SUITABILITY FOR INSTALLATION AND |
| | USE IN CONFORMITY WITH THE PROVISIONS OF THIS CODE. NEC |
| | 110.3(A)(1 THRU 8) |
| | |
| | 3) PROVIDE PRODUCT APPROVALS AND CUT SHEETS FOR FLOOR |
| | BOXES TO SHOW CODE COMPLIANCE WITH FIRE RATING FROM |
| | FLOOR TO FLOOR. ADDITIONAL INFORMATION REQUIRED. FBC |
| | 107.2.1.3 |
| | |
| | 4) IDENTIFY ALL NEW FEEDERS ON THE RISER DIAGRAM. |
| | ADDITIONAL INFORMATION REQUIRED. FBC 107.2.1.3 |
| | |
| | 5) ONE 125VOLT, SINGLE-PHASE, 15 OR 20AMP GFI |
| | RECEPTACLE OUTLET SHALL BE INSTALLED AT AN ACCESSIBLE |
| | LOCATION FOR THE SERVICING OF HEATING, |
| | AIR-CONDITIONING, AND REFRIGERATION EQUIPMENT. THE |
| | RECEPTACLE SHALL BE LOCATED ON THE SAME LEVEL AND |
| | WITHIN 25FT OF THE HEATING, AIR-CONDITIONING, AND |
| | REFRIGERATION EQUIPMENT. THE RECEPTACLE OUTLET SHALL |
| | NOT BE CONNECTED TO THE LOAD SIDE OF THE EQUIPMENT |
| | DISCONNECTING MEANS. NEC 210.63 SEE 210.8(A)(3), ALL 15 |
| | AND 20AMP, 125V AND 250V RECEPTACLES INSTALLED IN IN A |
| | WET LOCATION SHALL HAVE AN ENCLOSURE THAT IS |
| | WEATHERPROOF WHETHER OR NOT THE ATTACHMENT PLUG CAP IS |
| | INSERTED. ALL 15- AND 20-AMPERE, 125- AND 250-VOLT |
| | NON-LOCKING RECEPTACLES SHALL BE LISTED |
| | WEATHER-RESISTANT TYPE. NEC 406.8(B)(1) |
| | |
| | 6) WHERE A REQUIRED FIRE ALARM SYSTEM IS OUT OF SERVICE |
| | FOR MORE THAN 4 HOURS IN A 24-HOUR PERIOD, THE AHJ |
| | SHALL BE NOTIFIED, AND THE BUILDING SHALL BE EVACUATED |
| | OR AN APPROVED FIRE WATCH SHALL BE PROVIDED FOR ALL |
| | PARTIES LEFT UNPROTECTED BY THE SHUTDOWN UNTIL THE FIRE |
| | ALARM SYSTEM HAS BEEN RETURNED TO SERVICE. |
| | [101:9.6.1.6] NFPA-1, CHAPTER 13 SECTION 13.7.1.4.4 |
| | |
| | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, |
| | 561-805-6717 OR [email protected] |
| | |