Text |
| 2014-09-09 07:58:03 | DATE: 9/9/2014 | | | PROJECT: IDEAL FLOORING | | | PERMIT#: 13030161, REVISION#14060003 | | | CODE: 2008 EDITION OF THE NEC | | | 2010 EDITION OF THE FBC | | | 2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, | | | ADMINISTRATION, 2012 FBC SUPPLEMENTS. | | | | | | 2ND ELECTRICAL PLAN REVIEW | | | ACTION: PROVISO | | | | | | 1) PANEL SCHEDULE FOR PANEL MDP DOES NOT INCLUDE THE | | | CIRCUIT FOR PANEL "A" THE PLAN INDICATES THAT THE LOAD | | | FOR PANEL A IS INCLUDED IN THE PANEL SCHEDULE. PLEASE | | | ADJUST THE PANEL SCHEDULE TO REFLECT THE LOAD FOR PANEL | | | "A" IN THE PANEL SCHEDULE AND THE LOAD CALCULATION. | | | | | | 2) REVISE THE RISER TO INDICATE THE PIPE WIRE SIZES IN | | | THE RISER TO THE WEATHERHEAD. | | | | | | PROVIDE THIS INFORMATION TO THE INSPECTOR IN THE FIELD | | | PRIOR TO FINAL INSPECTION. | | | | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | | 561-805-6717 OR [email protected] | | | |
|