| 2014-08-27 13:18:16 | 1) SUBMIT SIZING CALCULATIONS FOR THE OIL/SAND |
| | SEPARATORS. THE SEPARATOR'S DESIGN SHALL COMPLY W/ 2010 |
| | FPC SEC.1003.4.2. THRU 1004.4.2.2. |
| | 2) CIVIL DRAWINGS- SHT. 7 OF 16-SHOW THE PIPE SIZES FOR |
| | THE PIPE COMING FROM THE WASH TUNNEL & THE HAND WASH |
| | BAY TO THE INTERCEPTORS, SIZE THE DIFFERENT SECTIONS OF |
| | THE SANITARY SEWER SYSTEM FROM THE MAIN OFFICE |
| | BUILDING. WPB ADMIN. AMEND. TO 2010 FBC SEC.107.2.1. |
| | 3) SHT. 0-1-GRAB BAR DETAILS- GRAB BARS ARE SHOWN |
| | INSTALLED IN A VERTICAL POSITION. GRAB BARS SHALL BE |
| | INSTALLED IN A HORIZONTAL POSITION PER THE FLA. ACCESS. |
| | CODE SEC 609.4. |
| | 4) SHT. 0-1- SHOW THE HIGH SIDE REACH/ LOW SIDE REACH |
| | DIMENSIONS ON THE PLANS. REACH RANGE LIMITS SHALL |
| | COMPLY W/ FAC SEC.308.3. |
| | 5) SHT. 0-5- PROVIDE THE OCCUPANT LOAD FOR THIS |
| | PROJECT. THE OCCUPANT LOAD SHALL BE CALCULATED IN |
| | ACCORDANCE W/ SEC.1004 & TABLE 1004.1 OF THE 2010 FBC. |
| | 6) CLEARLY SHOW THE REQUIRED CLEAR FLOOR SPACES FOR THE |
| | FIXTURES IN ALL THE TOILET ROOMS AND FOR THE DRINKING |
| | FOUNTAINS ON THE FLOOR PLANS. WPB ADMIN. AMEND. TO 2010 |
| | FBC SEC. 107.2.1. |
| | 7) SUBMIT AN ENLARGED FLOOR PLAN FOR ALL THE TOILET |
| | ROOMS & THE 2ND FLOOR BATH ROOM. SHOW THE LENGTH AND |
| | WIDTH DIMENSIONS OF THE SHOWER. THE BATHROOM SHALL |
| | COMPLY W/SEC.213.1 THRU 213.3.6. & SEC.608. OF THE 2010 |
| | FAC. |
| | 8) SUBMIT A PIPING RISER DETAIL FOR THE VACUUM PIPING |
| | AND SHOW THE CENTRAL VACUUM UNITS ON THE FLOOR PLAN.WPB |
| | ADMIN. AMEND. TO 2010 FBC SEC.107.2.1. |
| | 9) SUBMIT A STORM DRAINAGE RISER FOR THE ROOF DRAINAGE |
| | FOR EACH BUILDING SHOWING THE SQUARE FOOTAGE DRAINED BY |
| | EACH ROOF DRAIN. SHOW ALL PIPE SIZES AND THE POINT OF |
| | DISPOSAL ON THE STORM DRAINAGE RISER. INCLUDE |
| | CALCULATIONS FOR THE TOWER ROOF THAT DRAINS ONTO THE |
| | LOWER ROOF.THE SQUARE FOOT CALCULATIONS FOR THE TOWER |
| | ROOF SHALL INCLUDE 1/2 THE AREA OF ANY VERTICAL WALL |
| | THAT DIVERTS RAINWATER TO THE ROOF. SHOW THE LENGTH AND |
| | WIDTH OF THE TOWER ROOF ON SHT. 3-1 PER 2010 FPC SEC. |
| | 1106.4. |
| | PER 2010 FPC SEC. 1106.4. |
| | 10.) SHT. P-1- SHOW THE SIZE OF THE DRAINS FROM THE |
| | WASH TUNNEL AND THE HAND WASH BAY ON THE PLAN. |
| | 11) SUBMIT PIPING DETAILS & PLAINS FOR THE RECLAIM |
| | SYSTEM. |
| | 12) SUBMIT A COMPLETE WATER PIPNG RISER FOR THE HAND |
| | WASH SYSTEM AND LABEL THE HAND WASH BAY ON SHT.2-1. |
| | 13) SHOW THE REQUIRED BACKFLOW PREVENTERS ON THE WATER |
| | PIPING RISERS ON SHT. P-2. |
| | 14) SIZE ALL SECTIONS OF THE SANITARY AND WATER RISERS |
| | ON SHT. P-2. |
| | 15) SUBMIT MSDS SHEETS FOR ALL THE CHEMICALS BEING USED |
| | AND SHOW ON THE PLAN WHERE THE CHEMICALS WILL BE |
| | STORED. |
| | 16) SUBMIT A COMPLETE WATER PIPING RISER FOR THE CAR |
| | WASH AREA. 2010 WPB ADMIN. AMEND. TO FBC SEC. 107.2.1. |
| | 17) TOILET ROOM A103 IS NOT SHOWN ON THE WATER PIPNG |
| | RISER. |
| | 18) SHOW THE OIL SEPARATORS AND ALL ASSOCIATED PIPING |
| | ON THE RISER DIAGRAM. |
| | |
| | |