Plan Review Notes
Plan Review Notes For Permit 14050151
Permit Number 14050151
Review Stop P
Sequence Number 2
Notes
Date Text
2014-08-27 13:18:161) SUBMIT SIZING CALCULATIONS FOR THE OIL/SAND
 SEPARATORS. THE SEPARATOR'S DESIGN SHALL COMPLY W/ 2010
 FPC SEC.1003.4.2. THRU 1004.4.2.2.
 2) CIVIL DRAWINGS- SHT. 7 OF 16-SHOW THE PIPE SIZES FOR
 THE PIPE COMING FROM THE WASH TUNNEL & THE HAND WASH
 BAY TO THE INTERCEPTORS, SIZE THE DIFFERENT SECTIONS OF
 THE SANITARY SEWER SYSTEM FROM THE MAIN OFFICE
 BUILDING. WPB ADMIN. AMEND. TO 2010 FBC SEC.107.2.1.
 3) SHT. 0-1-GRAB BAR DETAILS- GRAB BARS ARE SHOWN
 INSTALLED IN A VERTICAL POSITION. GRAB BARS SHALL BE
 INSTALLED IN A HORIZONTAL POSITION PER THE FLA. ACCESS.
 CODE SEC 609.4.
 4) SHT. 0-1- SHOW THE HIGH SIDE REACH/ LOW SIDE REACH
 DIMENSIONS ON THE PLANS. REACH RANGE LIMITS SHALL
 COMPLY W/ FAC SEC.308.3.
 5) SHT. 0-5- PROVIDE THE OCCUPANT LOAD FOR THIS
 PROJECT. THE OCCUPANT LOAD SHALL BE CALCULATED IN
 ACCORDANCE W/ SEC.1004 & TABLE 1004.1 OF THE 2010 FBC.
 6) CLEARLY SHOW THE REQUIRED CLEAR FLOOR SPACES FOR THE
 FIXTURES IN ALL THE TOILET ROOMS AND FOR THE DRINKING
 FOUNTAINS ON THE FLOOR PLANS. WPB ADMIN. AMEND. TO 2010
 FBC SEC. 107.2.1.
 7) SUBMIT AN ENLARGED FLOOR PLAN FOR ALL THE TOILET
 ROOMS & THE 2ND FLOOR BATH ROOM. SHOW THE LENGTH AND
 WIDTH DIMENSIONS OF THE SHOWER. THE BATHROOM SHALL
 COMPLY W/SEC.213.1 THRU 213.3.6. & SEC.608. OF THE 2010
 FAC.
 8) SUBMIT A PIPING RISER DETAIL FOR THE VACUUM PIPING
 AND SHOW THE CENTRAL VACUUM UNITS ON THE FLOOR PLAN.WPB
 ADMIN. AMEND. TO 2010 FBC SEC.107.2.1.
 9) SUBMIT A STORM DRAINAGE RISER FOR THE ROOF DRAINAGE
 FOR EACH BUILDING SHOWING THE SQUARE FOOTAGE DRAINED BY
 EACH ROOF DRAIN. SHOW ALL PIPE SIZES AND THE POINT OF
 DISPOSAL ON THE STORM DRAINAGE RISER. INCLUDE
 CALCULATIONS FOR THE TOWER ROOF THAT DRAINS ONTO THE
 LOWER ROOF.THE SQUARE FOOT CALCULATIONS FOR THE TOWER
 ROOF SHALL INCLUDE 1/2 THE AREA OF ANY VERTICAL WALL
 THAT DIVERTS RAINWATER TO THE ROOF. SHOW THE LENGTH AND
 WIDTH OF THE TOWER ROOF ON SHT. 3-1 PER 2010 FPC SEC.
 1106.4.
 PER 2010 FPC SEC. 1106.4.
 10.) SHT. P-1- SHOW THE SIZE OF THE DRAINS FROM THE
 WASH TUNNEL AND THE HAND WASH BAY ON THE PLAN.
 11) SUBMIT PIPING DETAILS & PLAINS FOR THE RECLAIM
 SYSTEM.
 12) SUBMIT A COMPLETE WATER PIPNG RISER FOR THE HAND
 WASH SYSTEM AND LABEL THE HAND WASH BAY ON SHT.2-1.
 13) SHOW THE REQUIRED BACKFLOW PREVENTERS ON THE WATER
 PIPING RISERS ON SHT. P-2.
 14) SIZE ALL SECTIONS OF THE SANITARY AND WATER RISERS
 ON SHT. P-2.
 15) SUBMIT MSDS SHEETS FOR ALL THE CHEMICALS BEING USED
 AND SHOW ON THE PLAN WHERE THE CHEMICALS WILL BE
 STORED.
 16) SUBMIT A COMPLETE WATER PIPING RISER FOR THE CAR
 WASH AREA. 2010 WPB ADMIN. AMEND. TO FBC SEC. 107.2.1.
 17) TOILET ROOM A103 IS NOT SHOWN ON THE WATER PIPNG
 RISER.
 18) SHOW THE OIL SEPARATORS AND ALL ASSOCIATED PIPING
 ON THE RISER DIAGRAM.
  
  
 PLUMBING PLAN REVIEW
 TIM LARGE-
 CHIEF PLUMBING INSPECTOR
 TEL:561-805-6692
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved