| 2014-05-22 08:38:14 | PLANNING AND ZONING COMMENTS ***FAILED*** |
| | |
| | 5/22/14 |
| | |
| | 1. SITE PLAN WITH SITE DETAILS (FAR, OPEN SPACE, |
| | PARKING CALCULATION, ETC.) HAS NOT BEEN INCLUDED. |
| | PLEASE REVISE |
| | |
| | 2. PARKING DETAIL ON SHEET 3 OF 16 DOES NOT CONTAIN THE |
| | CORRECT STRIPING DETAIL FOR THE CITY OF WEST PALM |
| | BEACH. |
| | A. ALL LINES SHOULD BE DOUBLE STRIPED AND CONNECTED AT |
| | THE BOTTOM. STRIPES SHOULD BE 4' WIDE AND SEPARATED BY |
| | 12'. YOU CAN CONTACT PLANNING AND ZONING FOR A COPY OF |
| | THE DETAIL. |
| | B. THE STRIPING DETAIL SHOWS 9' WIDE SPACES, HOWEVER, |
| | THE SITE PLAN SHOWS THE SPACES AS 8.5' WIDE. |
| | ADDITIONALLY, THE THREE (3) SPACES SOUTH OF THE |
| | HANDICAP PARKING SPACE ARE SHOWN AS 9' WIDE, BUT |
| | DIMENSIONALLY WILL NOT FIT IN THAT AREA. PLEASE REVISE. |
| | C. NO STRIPING DETAIL WAS PROVIDED FOR THE ANGLED |
| | PARKING SPACES. PLEASE REVISE. |
| | |
| | 3. PLAN SHOWS WHEEL STOPS, BUT NO WHEEL STOP DETAIL WAS |
| | PROVIDED. PLEASE REVISE. |
| | |
| | 4. PLAN DID NOT INCLUDE A DETAIL FOR THE BICYCLE |
| | PARKING. PLEASE REVISE. |
| | |
| | 5. PLAN SHOWS DUMPSTER ENCLOSURE BUT NO DETAIL WAS |
| | INCLUDED. PLEASE REVISE. |
| | |
| | 6. SITE PLAN DOES NOT MATCH PROPOSED BUILDING AT THE |
| | LOCATION OF THE 'FRONT OFFICE'. THE BUILDING PLANS SHOW |
| | AN ADDITIONAL BATHROOM NEXT TO THE FRONT OFFICE. PLEASE |
| | VERIFY SIZE OF THE STRUCTURE AND ANY IMPACT TO THE SITE |
| | PLAN. |
| | |
| | 7. SUBMITTAL PACKET NEEDS TO INCLUDE SURVEY OF THE |
| | PROPERTY. |
| | |
| | 8. THE ZONING BOARD OF APPEALS FINAL ORDER FOR THE |
| | SUBJECT PROJECT REQUIRES CREATION OF A CROSS ACCESS |
| | EASEMENT ALONG THE NORTHEAST DRIVEWAY TO PROVIDE FOR |
| | FUTURE CONNECTION FOR VEHICULAR CIRCULATION. THIS |
| | EASEMENT DOCUMENT HAS NOT YET BEEN RECEIVED. |
| | |
| | 9. A SEPARATE PERMIT FOR THE LANDSCAPING SHALL BE |
| | SUBMITTED. |
| | |
| | 10. A CONDITION OF SITE PLAN APPROVAL STATED THAT |
| | VERTICAL DATUM NEEDED TO BE INDICATED ON THE |
| | ENGINEERING PLANS AND DOES NOT APPEAR TO HAVE BEEN |
| | ADDRESSED. |
| | |
| | 11. WHAT IS THE PURPOSE OF THE 24" CONCRETE FLUME IN |
| | THE NORTHEAST LANDSCAPE ISLAND? |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT: |
| | |
| | DANIELLE J. KITTREDGE, AICP |
| | SENIOR PLANNER |