| Plan Review Notes For Permit 14050119 |
| Permit Number |
14050119 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2014-05-16 11:37:38 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. ENGINEERING REQUIRED TO DETERMINE WIND DESIGN | | | PRESSURES FOR BUILDINGS OVER 120', FBC 1609. | | | | | | 2. SEE SHEET 9 OF THE PRODUCT APPROVAL. C4, 43 PSF WAS | | | CIRCLED, BUT INSTALLATION SCHEDULE PROPOSES -58.5 DP. | | | AFTER ENGINEER SPECIFIES DESIGN PRESSURE, REVISE ANCHOR | | | SPACING ACCORDINGLY. SPACING PROPOSED DOES NOT COMPLY | | | WITH THE DESIGN PRESSURE PROPOSED. FOR -58.5 DP, USE | | | THE 62PSF ROW, 8.5" REQUIRED. | | | | | | | | | | | | |
|