| Plan Review Notes For Permit 14050112 |
| Permit Number |
14050112 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2014-06-04 17:32:52 | 2010 FBC | | | | | | GAS REVIEW DENIED | | | | | | 1) THE 3/4" SCHEDULE 40 METALLIC PIPE SPECIFIED FOR THE | | | 2 LB SYSTEM FROM THE METER TO THE FIRST BRANCH IS TOO | | | SMALL. THE CAPACITY FROM TABLE 402.4(3) FOR 3/4" PIPE | | | AT 100 FEET IS 934 MBH AND THE REQUIRED LOAD IS 945 MBH | | | PER THE PLAN ON SHEET P-2.1. PLEASE CORRECT. FBC FUEL | | | GAS 402.1 | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|