| Date |
Text |
| 2014-04-01 15:20:20 | FAILED |
| | |
| | PROVIDE RESPONSES IN WRITING. |
| | |
| | 1) THE RELOCATION OF THE BICYCLE RACKS NORTH ALONG THE |
| | BUILDING DOES NOT COMPLY WITH REQUIREMENT IN THE DESIGN |
| | GUIDELINES THAT THE BICYCLE PARKING PROVIDED IN PBA #1 |
| | BE DISTRIBUTED EVENLY THROUGHOUT THE PBA. AFFECTS |
| | SHEETS A-100, A-101 AND A-103. |
| | |
| | 2) ON SHEET A201 THERE ARE MULTIPLE AREAS WHERE |
| | EYEBOLTS ARE MENTIONED ON THE FACADE (SEE BELOW AND |
| | CLOUDED ON ELEVATION SHEET). PLEASE NOTE, THAT EXCEPT |
| | FOR THE 30 DAY GRAND OPENING BANNER FOR A SPECIFIC |
| | STORE, THE DESIGN GUIDELINES DO NOT PERMIT BANNERS |
| | MOUNTED TO BUILDINGS IN PBA 1. PER THE DESIGN |
| | GUIDELINES, BANNERS MAY NOT BE USED FOR PERMANENT |
| | SIGNAGE AND THE ONLY TEMPORARY SIGNAGE MAY OCCUR WITHIN |
| | THE WINDOWS. |
| | |
| | A. "EYEBOLTS FOR (2) TEMPORARY BANNERS". |
| | B. "GALVANIZED METAL EYEBOLTS FOR THE DISPLAY OF FUTURE |
| | ADVERTISEMENT BANNERS". |
| | C. "GALVANIZED EYEBOLTS FOR BANNER ATTACHMENT". |
| | D. ABOVE THE ENTRY TO SUITE A02. |
| | |
| | 3) THE AWNING OVER THE DOOR ON THE NORTH SIDE OF THE |
| | BUILDING SHALL BE CENTERED OVER THE DOOR (SEE CLOUD ON |
| | SHEET A201). |
| | |
| | 4) CENTER AWNINGS OVER REAR DOORS - SEE CLOUDS ON SHEET |
| | A202. |
| | |
| | 5) CHAIN LINK IS NOT PERMITTED PER THE DESIGN |
| | GUIDELINES. ONE OF THE LOADING DOCKS USES CHAIN LINK IN |
| | THE FENCING (CLOUDED ON PLANS). |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
| | |
| | |
| | |
| 2014-03-28 09:50:35 | 3/28/14 |