| 2014-02-20 10:35:34 | ** FAILED ** |
| | |
| | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE |
| | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE |
| | APPLICABLE: |
| | |
| | 1.) THE SITE PLAN SHOWS A 10 FT. UTILITY EASEMENT ON |
| | THE NORTH SIDE OF THE PROPERTY AND A 7 FT. 6-INCH |
| | UTILITY EASEMENT ON THE SOUTH SIDE OF THE PROPERTY; |
| | HOWEVER, THESE EASEMENTS ARE NOT SHOWN IN THE SURVEY. |
| | ARE THESE EASEMENTS EXISTING OR PROPOSED, AND TO WHICH |
| | PROVIDER DO THEY BELONG TO? PROVIDE DOCUMENTATION ON |
| | THESE EASEMENTS. |
| | |
| | 2.) THE SITE PLAN SHOW PROPOSED STRUCTURES WITHIN THE |
| | 10 FT. AND 7 FT. 6-INCHES UTILITY EASEMENTS. EASEMENT |
| | CONSENT FROM THE UTILITY PROVIDER(S) IS NECESSARY IN |
| | ORDER TO BUILD WITHIN THESE EASEMENTS. |
| | |
| | 3.) PLEASE IDENTIFY WHAT THE 4 FT. BY 4 FT. CONCRETE |
| | PAD AT THE NORTHWEST CORNER OF THE PROPERTY WILL BE |
| | UTILIZED FOR. |
| | |
| | 4.) THE MAXIMUM BUILDING HEIGHT IN THE SF7 RESIDENTIAL |
| | ZONING DISTRICT IS 30 FT. THE PROPOSED RESIDENCE |
| | EXCEEDS THIS MAXIMUM REQUIREMENT. (ZLDR S.94-72(A)(3)) |
| | |
| | 5.) MECHANICAL EQUIPMENT, INCLUDING THE CONCRETE PAD TO |
| | WHICH THE EQUIPMENT WILL SIT ON, MAY NOT PROJECT MORE |
| | THAN 4 FT. INTO A SETBACK. THE A/C EQUIPMENT ON THE |
| | NORTH SIDE, AND THE A/C EQUIPMENT AND GENERATOR ON THE |
| | SOUTH SIDE OF THE PROPERTY DOES NOT MEET THIS |
| | REQUIREMENT. (ZLDR S.94-305(B)(4)) |
| | |
| | 6.) PROVIDE CLARIFICATION ON THE SQUARE ELEMENT IN THE |
| | PROPOSED ATRIUM. THIS ELEMENT IS NOT VISIBLE ON ANY OF |
| | THE PLANS, WITH EXCEPTION TO THE SITE PLAN (SHEET SP1). |
| | |
| | 7.) THE RETAINING WALL W/ FENCE ON TOP SHALL NOT EXCEED |
| | 4 FT. IN HEIGHT WITHIN THE FIRST 25 FT. OF THE FRONT |
| | LOT LINE. PLEASE DOCUMENT/ILLUSTRATE THAT THIS |
| | REQUIREMENT IS MET. |
| | |
| | 8.) A LANDSCAPE PLAN IS REQUIRED FOR THIS PROJECT AND |
| | SHALL BE SUBMITTED AND APPROVED BY A SEPARATE PERMIT. |
| | (ZLDR S.94-441(B)) |
| | |
| | 9.) THE FOLLOWING LANDSCAPING REQUIREMENTS SHALL BE |
| | ADDRESSED IN THE LANDSCAPE PLAN. INCLUDE ALL LANDSCAPE |
| | CALCULATIONS TO ILLUSTRATE THAT THE PROJECT COMPLIES |
| | WITH ZLDR, ARTICLE XIV : |
| | |
| | - AT LEAST ONE SHADE, FLOWERING OR FRUIT TREE SHALL BE |
| | PLANTED FOR EACH 1,200 SQ. FT. OF OPEN SPACE OR PORTION |
| | THEREOF. (ZLDR S.94-442(B)(2) A.) |
| | |
| | - AT LEAST ONE (1) SHRUB SHALL BE PLANTED FOR EACH 500 |
| | SQ. FT. OF OPEN SPACE OR PORTION THEREOF. (ZLDR |
| | S.94-442(B)(2) A.) |
| | |
| | 10.) THE FRONT YARD (MEASURED FROM THE FRONT BUILDING |
| | FACADE TO THE PROPERTY LINE) SHALL HAVE A MINIMUM OF |
| | 1,000 SQ. FT. OR 75 PERCENT OF LANDSCAPED AREA. (ZLDR |
| | S. 94-482(A)) |
| | |
| | 11.) THERE SEEMS TO BE EXISTING TREES/PALMS ON THE |
| | PROPERTY. PLEASE NOTE THAT A TREE ALTERATION PERMIT IS |
| | REQUIRED PRIOR TO THE REMOVAL AND/OR RELOCATION OF ANY |
| | TREE IN THE CITY. PLEASE SUBMIT AN APPLICATION FOR A |
| | TREE ALTERATION PERMIT. |
| | |
| | 12.) A TREE ALTERATION PERMIT CAN BE OBTAINED ON THE |
| | CITY'S WEBSITE FOLLOWING THIS PATH: |
| | HTTP://WPB.ORG/PLANNING/WP |
| | -CONTENT/UPLOADS/SITES/37/2013/04/TREEALTERATIONPERMITR |
| | EVISED03-12-09.PDF |
| | |
| | PLEASE NOTE THAT ANY REVISIONS MAY RESULT IN ADDITIONAL |
| | COMMENTS. CONTACT LINDA LOUIE @ (561) 822-1458 IF YOU |
| | HAVE QUESTIONS. |
| | |