| Date |
Text |
| 2014-03-29 11:07:46 | 2010 BC |
| | |
| | DENIED BY BUILDING |
| | |
| | 1) THE PROPOSED CONSTRUCTION IS LOCATED IN AN A5 FLOOD |
| | ZONE WITH A 7' BASE FLOOD ELEVATION. THE CITY OF WEST |
| | PALM BEACH' S FLOOD ORDINANCE REQUIRES A 6" FREE-BOARD. |
| | THEREFORE, THE SINGLE FAMILY DWELLING AND ALL OF THE |
| | EQUIPMENT THAT SERVICE THE STRUCTURE ARE REQUIRED TO |
| | HAVE A MINIMUM FINISH FLOOR ELEVATION AT OR ABOVE 7.5' |
| | BFE NGVD 1929. SPECIFY THE PROPOSED ELEVATIONS FOR THE |
| | DWELLING AND EQUIPMENT ON THE PLANS. BECAUSE THE |
| | CURRENT FEMA FLOOD INSURANCE RATE MAPS (FIRM) THAT ARE |
| | ADOPTED BY THE CITY OF WPB USE THE NGVD 1929 FOR |
| | DETERMINING ELEVATIONS, PLEASE SPECIFY ALL ELEVATIONS |
| | IN NGVD 1929 ON THE PLANS. CITY AMENDMENTS 107.2.1 AND |
| | FBC R322 |
| | |
| | 2) SUBMIT TWO SETS OF ELEVATION CERTIFICATES FOR THE |
| | PROPOSED DWELLING. ADDITIONAL ELEVATION CERTIFICATES |
| | WILL BE REQUIRED PRIOR TO FINAL INSPECTION. CITY |
| | AMENDMENTS 107.2.1 AND FBC R322 |
| | |
| | 3) SUBMIT TWO SETS OF PLANS THAT SHOW COMPLIANCE WITH |
| | FBC R401.3 FOR SURFACE WATER DRAINAGE AWAY FROM THE |
| | STRUCTURE AND TO AN APPROVED POINT OF COLLECTION. |
| | |
| | 4) THE STRUCTURE IS LOCATED ON THE INTER-COASTAL WATER |
| | WAY AND IS CONSIDERED TO BE EXPOSURE D PER FBC |
| | R301.2.1.4.3. THE PLANS SPECIFY IT AS EXPOSURE C. |
| | PLEASE REVISE THE PLANS AS NECESSARY. |
| | |
| | 5) SUBMIT TWO COPIES OF THE MANUFACTURER'S INSTALLATION |
| | INSTRUCTIONS AND LISTING FOR THE VENT-LESS FIREPLACE. |
| | CITY AMENDMENTS 107.2.1 AND FBC R1004.1 |
| | |
| | 6) SUBMIT TWO COPIES OF THE PRODUCT EVALUATION AND THE |
| | MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR THE SPRAY |
| | FOAM INSULATION THAT WILL BE INSTALLED. |
| | |
| | 7) SUBMIT TWO COPIES OF THE MANUFACTURER'S INSTALLATION |
| | INSTRUCTIONS AND LISTING FOR THE GAS BBQ GRILL LOCATED |
| | ON THE COVERED PATIO. CITY AMENDMENTS 107.2 AND FBCR |
| | M1901.2 |
| | |
| | 8) SUBMIT TWO COPIES OF PRODUCT APPROVALS FOR THE |
| | FOLLOWING: METAL ROOFING, ROOFING MATERIAL FOR FLAT |
| | ROOF, WATER PROOFING SYSTEM THAT WILL BE USED ON SECOND |
| | FLOOR BALCONY, 8" PRECAST LINTELS, FIXED WINDOWS, |
| | STRUCTURAL WINDOW MULLIONS, CUSTOM MAHOGANY FRONT DOOR |
| | ASSEMBLY, FIBER GLASS RAISED PANEL SWING DOOR AND |
| | FRENCH DOORS AS REQUIRED BY DCA RULE 9N-3. |
| | |
| | 9) PRODUCT APPROVALS REQUIRED BY RULE 9N-3 ARE REQUIRED |
| | TO BE REVIEWED AND APPROVED IN WRITING BY THE DESIGNER |
| | OF RECORD FOR THE PROJECT. CITY AMENDMENTS 107.3.4.1 |
| | |
| | 10) IN ORDER TO REDUCED REVIEW TIME, PLEASE SUBMIT A |
| | RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW |
| | COMMENTS WAS ADDRESSED. |
| | |
| | NOTE: SEPARATE APPLICATIONS, PERMITS AND REVIEWS ARE |
| | REQUIRED FOR THE GENERATOR, POOL, FIRE PIT, NATURAL |
| | GAS, RETAINING WALL, FENCES AND SITE WALLS. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |
| | [email protected] |