| 2014-04-30 15:51:49 | FAILED |
| | |
| | 1) REPEAT COMMENT: THE GAP BETWEEN TREES IN THE BUFFER |
| | AT THE NORTHWEST CORNER OF THE SITE IS GREATER THAN 30 |
| | FEET. THIS IS ADJACENT TO THE RESIDENTIAL PROPERTY TO |
| | THE NORTH WHERE THE TREE SPACING HELPS OFFSET THE LONG |
| | EXPANSE OF THE WALL. |
| | |
| | 2) REPEAT COMMENT: SHEET LP-7 CALLS OUT 7 RELOCATED |
| | ROYAL PALM TREES ALONG PALM BEACH LAKES BOULEVARD. ONLY |
| | 6 ARE SHOWN. PLEASE CORRECT PLANS AND PROVIDE WHERE THE |
| | EXTRA RELOCATED ROYAL PALM TREE WAS INSTALLED. |
| | |
| | 3) REPEAT COMMENT: BUFFER CALCULATIONS: |
| | |
| | A. CONGRESS BUFFER STATES 54 TREES PROVIDED, YET ONLY |
| | 53 TREES WHEN TOTALING THE DATA. STAFF HAS NOTED THAT |
| | THE PERMIT SET DOES NOT MATCH PREVIOUS PLAN SETS ALONG |
| | THIS BUFFER. PLEASE VERIFY THAT THE TREE COUNTS ARE |
| | STILL ACCURATE. |
| | B. PALM BEACH LAKES BUFFER STATES 7 RELOCATED ROYAL |
| | PALM TREES YET ONLY 6 ARE SHOWN. |
| | |
| | 4) IT APPEARS THAT THE EASEMENT AND PIPE LAYERS WERE |
| | LAID ON TOP OF THE LANDSCAPE AND CURBING LAYERS. THE |
| | EASEMENTS AND PIPES OBSTRUCT THE PARKING LOT ISLAND AND |
| | CURBING LAYERS WHICH MAKES THE AFFECTED AREAS OF THE |
| | PLANS DIFFICULT TO INTERPRET. PLEASE SUBMIT PLANS WITH |
| | THE UTILITY LAYERS SUBSERVIENT TO THE LANDSCAPE AND |
| | CURBING LAYERS. |
| | |
| | 5) THERE ARE SHRUBS SHOWN ON TOP OF THE SIDEWALK |
| | LEADING TO THE REAR DOORS OF BUILDING J-6. |
| | |
| | 6) PLEASE ENSURE THAT THE TREE AND SHRUB TYPES AND |
| | COUNTS AGREE WITH THE SITE PLAN AMENDMENTS. THE COVER |
| | SHEET WITH THIS PERMIT SHOWS DIFFERENT SPECIES AND |
| | NUMBERS THAN THE LAST LANDSCAPE PLAN SUBMITTED AND THE |
| | LAST LANDSCAPE PLAN APPROVED. SEE COMMENT 2 FOR AN |
| | INSTANCE WHERE THE LABEL IS IN CONFLICT WITH THE NUMBER |
| | OF PALMS SHOWN ON THE PLAN. |
| | |
| | 7) THANK YOU FOR SHOWING GROUND COVER IN THE FIRST AND |
| | SECOND MEDIAN ISLANDS WHEN ENTERING FROM PALM BEACH |
| | LAKES BOULEVARD VIA ENTRANCE A AND IN THE FIRST MEDIAN |
| | ISLAND WHEN ENTERING FROM PALM BEACH LAKES BOULEVARD |
| | VIA ENTRANCE C. |
| | |
| | 8) STAFF IS DISAPPOINTED TO SEE THAT THERE WAS NO |
| | OPPORTUNITY TO INSTALL THE GROUND COVER IN THE OPEN |
| | AREA EAST OF BUILDING J-6, AS WELL AS NOTING THAT THE |
| | PREVIOUSLY SHOWN HAVE BEEN REMOVED. |
| | |
| | 9) STAFF IS DISAPPOINTED TO SEE THAT THE PALM TREES |
| | WITHIN THE FOUNDATION PLANTING OF BUILDING J-2 AND THE |
| | EAST SIDE OF BUILDING J-5 NOT KEPT AS PART OF THE |
| | LANDSCAPE DESIGN. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446. |