| Plan Review Notes For Permit 14010812 |
| Permit Number |
14010812 |
|
| Review Stop |
E |
| Sequence Number |
4 |
|
| Notes |
| Date |
Text |
| 2014-03-26 10:45:49 | THIS MORNING I CALLED THE EC TO DISCUSS THE ITEMS I AM | | | REQUIRING. THE PERSON INSISTED THAT THE GENERATOR IS | | | SUFFICIENT TO CARRY THE WHOLE HOUSE LOAD. WHEN | | | QUESTIONED ON HOW THE TWO PANELS WERE GOING TO BE | | | CONNECTED TO THE ATS, NOW A GUTTER WILL BE USED TO | | | SPLICE BOTH PANELS INTO A COMMON FEED OUT OF TERMINAL | | | T1 & T2. THE SUBMITTED LOAD CALCS WERE INCOMPLETE, | | | PROMPTING ME TO WORK OUT THE CALCS FOR MYSELF. | | | ACCORDING TO THE SUBMITTED CALCS, PANEL A HAS A LOAD OF | | | 88 AMP AND PANEL B OF 54 AMP. ACCORDING TO MY | | | CALCULATIONS, PANEL A HAS A LOAD OF 102 AMP AND PANEL B | | | OF 88 FOR A TOTAL LOAD OF 190 AMP. THE GENERATOR | | | SUPPLIES 150 AMP. THEREFORE THE LOAD SHED MODULE WILL | | | BE REQUIRED. I CALLED THE EC ONCE AGAIN AND HAD HIM | | | CALL ME BACK. | | 2014-03-21 11:26:48 | RATHER THAN FAILING THIS A THIRD TIME, I CALLED THE | | | ELECTRICAL CONTRACTOR FOR AN EXPLANATION. THIS | | | SUBMITTAL KEEPS COMING BACK W/O THE REQUIRED | | | CORRECTIONS. |
|