| Plan Review Notes For Permit 14010524 |
| Permit Number |
14010524 |
|
| Review Stop |
Z |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2014-01-16 08:29:27 | ** FAILED ** | | | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | | APPLICABLE: | | | | | | 1.) PROVIDE A SURVEY OF THE PROPERTY. | | | | | | 2.) THE PLANS INDICATE THE AWNING WILL PROJECT 3 FT. | | | FROM THE BUILDING; HOWEVER, THE ZLDR REQUIRES THE | | | AWNING TO PROJECT A MINIMUM OF 4 FT. FROM THE BUILDING | | | AT THE SIDEWALK LEVEL. PLEASE MODIFY PLANS FOR | | | CONSISTENCY WITH THE ZLDR. (ZLDR S.94-213(D)(14) A.) | | | | | | 3.) A RIGHT-OF-WAY PERMIT FROM THE CITY'S ENGINEERING | | | AND PUBLIC WORKS DEPARTMENT MAY BE REQUIRED IF THE | | | AWNING ENCROACHES OVER THE SIDEWALK. | | | | | | PLEASE NOTE THAT ANY REVISIONS MAY RESULT IN ADDITIONAL | | | COMMENTS. CONTACT LINDA LOUIE @ (561) 822-1442 IF YOU | | | HAVE QUESTIONS. |
|