| 2014-02-03 16:27:18 | |
| | SEE COMMENTS FROM THIRD REVIEW BELOW: |
| | |
| | |
| | |
| | |
| | THIRD MECHANICAL REVIEW CHECKLIST. |
| | CODE: 2010 FBC. |
| | |
| | 1- NEW A/C PLAN SUBMITTED. |
| | A) ***ORIGINAL COMMENT: REVISE THE CU MOUNTING DETAIL. |
| | REVISE THE NUMBER AND LOCATION OF HURRICANE CLIPS AS |
| | REQUIRED TO MATCH PAGE ONE OF 4 OF FLORIDA PRODUCT |
| | APPROVAL FL14239 SPECIFIED ON THE DETAIL. REQUIRED TO |
| | MEET THE DESIGN PRESSURES OF SEC. R301 OF 2010 AND SEC. |
| | M1307.2.1 OF 2010 FBC-RESIDENTIAL. |
| | |
| | ***RESPONSE: |
| | INFORMATION SUBMITTED STATED THAT USING ONLY ONE 2"X4" |
| | CLIP PER SIDE. IF USING ONLY ONE CLIP, THEN THE |
| | LOCATION OF THE CLIP HAS TO BE CLOSER TO THE CORNER OF |
| | THE UNIT NOT IN THE CENTER. SEE PRODUCT APPROVAL FOR |
| | EXACT LOCATION AND REVISE DETAIL AS REQUIRED. |
| | |
| | |
| | |
| | B) ***ORIGINAL COMMENT: AHU #1 IS MISSING THE BALANCED |
| | RETURN AIR REQUIRED BY SEC. M1602.4 OF 2010 |
| | FBC-RESIDENTIAL. |
| | |
| | ***RESPONSE: |
| | A/C PLAN SUBMITTED DOESN'T MATCH FLOOR PLAN LAYOUT FOR |
| | LOT 48. THEREFORE, UNABLE TO VERIFY COMPLIANCE. |
| | |
| | |
| | C) ***ORIGINAL COMMENT: REVISE SIZE OF TRANSFER DUCT |
| | SHOWN FOR MASTER BEDROOM. 14" TRANSFER DUCT DOESN'T |
| | COMPLY WITH EXCEPTION #1 AND #3 OF SEC. M1602.4. |
| | |
| | ***RESPONSE: |
| | A/C PLAN SUBMITTED DOESN'T MATCH FLOOR PLAN LAYOUT FOR |
| | LOT 48. THEREFORE, UNABLE TO VERIFY COMPLIANCE. |
| | NOTE: KEEP IN MIND THAT ALL SUPPLY AIR INTO THE MASTER |
| | SUITE SHALL BE INCLUDED (INCLUDE SUPPLY TO BATHROOM, |
| | CLOSETS, ETC). |
| | |
| | |
| | |