| Date |
Text |
| 2013-10-31 17:46:37 | 2010 FBC |
| | |
| | REVISIONS |
| | |
| | 1) THE REVISED PRODUCT APPROVALS FOR THE FRENCH DOORS, |
| | THE FIXED WINDOWS AND THE GARAGE DOOR ARE OK. |
| | |
| | 2) THE PRODUCT APPROVALS FOR THE METAL ROOF WERE |
| | APPROVED UNDER A PREVIOUS REVISION AND ARE NOT REQUIRED |
| | TO BE SUBMITTED AGAIN. |
| | |
| | 3) IN ORDER TO PROPERLY REVIEW THE PRODUCT APPROVALS |
| | FOR THE WINDOWS AND DOORS, THE WINDOW AND DOOR |
| | SCHEDULES ON SHEET A1.1 NEED TO BE REVISED TO SPECIFY |
| | THE CORRECT TYPES, SIZES AND THE LOCATIONS OF THE |
| | WINDOWS AND DOORS. PRODUCT APPROVALS WERE SUBMITTED FOR |
| | CASEMENT AND HORIZONTAL SLIDING WINDOWS. A PRODUCT |
| | APPROVAL WAS SUBMITTED FOR GLAZED FRENCH DOORS. |
| | HOWEVER, NO PRODUCT APPROVALS HAVE BEEN SUBMITTED FOR |
| | THE SOLID CORE FIBERGLASS DOORS ( NOS. 2 AND 7 IN THE |
| | SCHEDULE). CITY AMENDMENTS 107.2.1, FBCR 301.2.1 AND |
| | DCA RULE 9N-3 |
| | |
| | 4) THE REQUIRED OPENING PRESSURES LISTED IN THE |
| | SCHEDULE, STILL APPEAR TO BE A LITTLE LOW. PLEASE |
| | REVIEW TO SEE THAT PRESSURES ARE FOR 170 MPH VULT / 132 |
| | VASD, EXPOSURE C WITH A 20 FT MEAN ROOF HEIGHT. FBC |
| | R301.2.1 |
| | |
| | 5) SPECIFY THE MULLION DIMENSIONS AND THICKNESS AND |
| | INDICATE THE MULLION SPAN AND OPENING SIZE FOR EACH |
| | ASSEMBLY BY CIRCLING THESE ITEMS ON THE MULLION PRODUCT |
| | APPROVAL OR SUBMIT A DETAIL THAT PROVIDES THIS |
| | INFORMATION. FBC R301.2.1 |
| | |
| | 6) PLEASE SUBMIT TWO SETS OF A KEY PLAN AND AN |
| | INSTALLATION SCHEDULE THAT INDICATE WHERE AND HOW THE |
| | NAUTILUS ROLLING SHUTTER SYSTEM WILL BE INSTALLED. |
| | SPECIFY THE REQUIRED PRESSURES FOR THE OPENINGS, THE |
| | OPENING SIZES, THE SLAT SPAN, THE SUBSTRATE, THE EDGE |
| | DISTANCE, THE ANCHOR TYPES, ANCHOR SPACING, MULLION |
| | SPANS, STORM BAR SPANS AND ALL OTHER PERTINENT |
| | INFORMATION FROM THE PRODUCT APPROVAL DRAWINGS THAT IS |
| | REQUIRED TO PROPERLY INSTALL THE SYSTEM. FBC CITY |
| | AMENDMENTS 107.2.1 AND FBC R301.2.1.2 |
| | |
| | 7) THE ENGINEER'S REPORT THAT WAS SUBMITTED FOR THE |
| | CUSTOM FOLDING EXTERIOR DOOR SYSTEM IS INCOMPLETE. |
| | SUBMIT TWO COPIES OF THE REFERENCED TEST REPORT |
| | NCTL-3846-1 AND ANY OTHER REPORTS, PRODUCT APPROVALS, |
| | DOCUMENTS OR CALCULATIONS THAT MAY BE REQUIRED TO SHOW |
| | THAT THE CUSTOM DOOR ASSEMBLIES WHEN INSTALLED IN THE |
| | SPECIFIED CONFIGURATIONS ARE EQUAL TO THE TESTED |
| | ASSEMBLIES. THE BUILDING OFFICIAL WILL REVIEW THE |
| | DOCUMENTS AND ENGINEERING TO DETERMINE IF THE DOORS |
| | WILL COMPLY WITH SECTION R612.83 OF THE FLORIDA |
| | BUILDING CODE. |
| | |
| | WHEN YOU RESUBMIT THE REVISIONS, PLEASE SUBMIT A |
| | RESPONSE LETTER INDICATING HOW THE COMMENTS HAVE BEEN |
| | ADDRESSED. USE THE REVISION NUMBER ON THE RESUBMITTAL |
| | FORM. THANKS. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |
| | [email protected] |