| Plan Review Notes For Permit 13100665 |
| Permit Number |
13100665 |
|
| Review Stop |
E |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2013-12-11 20:07:45 | THE FOLLOWING ITEMS SHALL BE ADDRESSED AND CORRECTED | | | ACCORDINGLY: | | | 1. PAGE E1.0 "SPECIAL PURPOSE OUTLETS" THERE IS A | | | CONFLICT ON THE HEATER NOTES. THE NOTES CALL FOR POWER | | | SOURCE FROM PANEL PR. THE RISER DIAGRAM REFLECTS TWO | | | PANELS, A P AND A R, BUT NO PR. | | | 2. THE PANEL SCHEDULES FOR EITHER PANELS P OR R DO NOT | | | REFLECT ANY HEATER LOAD OR HVAC. | | | 3. THE ONLY OTHER HEATER IS THE EWH FED FROM THE MDP. | | | 4. DUE TO ALL THE RE-ARRANGEMENT OF LOADS ON THE | | | VARIOUS PANELBOARDS, INDIVIDUAL LOAD CALCS AND A PANEL | | | SCHEDULE SHALL BE PROVIDED FOR EACH PANEL. | | | 5. THE EXISTING RISER MENTIONS "RTU1" W/A 90A | | | DISCONNECT. THIS RTU1 DOES NOT APPEAR AGAIN AND NO | | | MENTION OF ITS REMOVAL IS MADE. | | | 6. THE TENANT RISER DIAGRAM REFLECTS AN "EXISTING RTU" | | | W/A 70A DISCONNECT AND A "NEW RTU" W/A 60A DISCONNECT. | | | AGAIN THERE IS A CONFLICT. | | | 7. IN AREAS OTHER THAN THOSE DIRECTLY ASSOCIATED WITH | | | PATIENT CARE OR THOSE AREAS REQUIRED FOR HEALTH & LIFE | | | SAFETY, COMPLIANCE W/THE FBC-ENERGY CONSERVATION IS | | | REQUIRED. |
|