| Plan Review Notes For Permit 13100302 |
| Permit Number |
13100302 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2013-11-01 18:02:02 | 2010 FBC | | | | | | DENIED BY BUILDING | | | | | | 1) THIS SCOPE OF WORK IS NOT CONSIDERED A REVISION TO | | | THE STRUCTURE. IT NEEDS TO BE A SEPARATE FENCE PERMIT | | | TYPE. SUBMIT A SEPARATE BUILDING PERMIT APPLICATION FOR | | | A FENCE. THE REVISION NUMBER WILL BE CHANGED TO THE | | | PERMIT NUMBER. | | | | | | 2) PROVIDE STRUCTURAL DETAILS WITH ALL DIMENSIONS | | | SPECIFIED FOR THE COLUMNS AT THE DRIVEWAY. | | | | | | 3) THE DRAWINGS DO NOT SPECIFY THAT THE 16" X 16" | | | COLUMN BLOCKS WILL BE FILLED WITH CONCRETE OR THE | | | REQUIRED STRENGTH OF THE OF IT. PLEASE PROVIDE THIS | | | INFORMATION. | | | | | | 4) THE ENTRY PIER ELEVATION SPECIFIES ONE #5 VERTICAL | | | REINFORCING BAR IN THE 16" SQUARE COLUMN. THIS MAY NOT | | | BE ADEQUATE TO RESIST THE LATERAL WIND LOADS ON THE | | | COLUMNS AND THE ATTACHED GATES. THE NOTE BELOW THE PIER | | | DETAIL SAYS BY ENGINEER AFTER AN ASTERISK. PLEASE HAVE | | | THE PERSON RESPONSIBLE FOR THE STRUCTURAL DESIGN REVIEW | | | THE DRAWINGS AND PROVIDE THEIR NAME AND SIGNATURE ON | | | THE PLANS. | | | | | | 5) PROVIDE THE ELECTRICAL DETAILS INCLUDING WIRE SIZES, | | | CONDUIT DETAIL AND GROUNDING DETAIL ON THE PLANS OR | | | APPLY UNDER A SEPARATE PERMIT. | | | | | | 6) PROVIDE A GAS RISER DIAGRAM ON THE PLAN OR APPLY | | | UNDER A SEPARATE PERMIT. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|