2013-11-13 12:44:546651 NORTH JOG ROAD - 500,000 GALLON FIRE WATER TANK
 TRACKING #13100293
 PERMIT #12040748
 REVIEW COMMENTS - FIRE DEPARTMENT
  
 THE APC BUILDING MAY CONSTITUTE A FIRE EXPOSURE TO FIRE
 WATER HOLDING TANK. PER NFPA 22: LOCATION OF TANKS.
 4.2.1 THE LOCATION OF TANKS SHALL BE SUCH THAT THE TANK
 AND STRUCTURE ARE NOT SUBJECT TO FIRE EXPOSURE.
 4.2.1.1 IF LACK OF YARD ROOM MAKES THIS IMPRACTICABLE,
 THE EXPOSED STEEL WORK SHALL BE SUITABLY FIREPROOFED OR
 SHALL BE PROTECTED BY OPEN SPRINKLERS.
 4.2.1.2 FIREPROOFING SHALL BE PROVIDED FOR STEELWORK
 WITHIN 20 FEET OF EXPOSURES, BUILDINGS OR WINDOWS, AND
 DOORS FROM WHICH FIRE MIGHT ISSUE.
  
 4.2.2 FIREPROOFING, WHERE REQUIRED, SHALL HAVE A FIRE
 RESISTANCE RATING OF NOT LESS THAN 2 HOURS.
  
 4.5.2 APPROVAL OF LAYOUTS.
 4.5.2.1 COMPLETE INFORMATION REGARDING THE TANK PIPING
 ON THE TANK SIDE OF THE CONNECTION TO THE YARD OR
 SPRINKLER SYSTEM SHALL BE SUBMITTED TO THE AUTHORITY
 HAVING JURISDICTION FOR APPROVAL.
 4.5.2.2 THE INFORMATION SUBMITTED SHALL INCLUDE THE
 FOLLOWING:
 (1) SIZE AND ARRANGEMENT OF ALL PIPES
 (2) SIZE, LOCATION, AND TYPE OF ALL VALVES, AND OTHER
 ACCESSORIES
 (3) STEAM PRESSURES AVAILABLE AT THE HEATER
 (4) ARRANGEMENT OF, AND FULL INFORMATION REGARDING, THE
 STEAM SUPPLY AND RETURN SYSTEM TOGETHER WITH PIPE SIZES
 (5) DETAILS OF CONSTRUCTION OF THE FROSTPROOF CASING
 (6) WHERE HEATING IS REQUIRED, HEAT LOSS CALCULATIONS
 (7) STRUCTURAL DRAWINGS AND CALCULATIONS
 (8) SEISMIC BRACING DETAILS AND CALCULATIONS
 (9) OPERATIONAL SETTINGS AND SEQUENCE OF OPERATION
 (10) MONITORING EQUIPMENT AND CONNECTIONS
 (11) UNDERGROUND DETAILS INCLUDING FOUNDATIONS,
 COMPACTION,
 AND BACKFILL DETAILS AND CALCULATIONS
  
 4.8 LIGHTNING PROTECTION. TO PREVENT LIGHTNING DAMAGE
 TO TANKS, PROTECTION SHALL BE INSTALLED IN ACCORDANCE
 WITH SECTION 4.4 OF NFPA 780.
  
 14.2.12 CONTROLLING VALVES.
 14.2.12.1 A LISTED GATE VALVE SHALL BE PLACED IN THE
 DISCHARGE PIPE ON THE YARD SIDE OF THE CHECK VALVE
 BETWEEN THE CHECK VALVE AND ANY CONNECTION OF THE TANK
 DISCHARGE TO OTHER PIPING.
  
 14.2.12.3 A LISTED INDICATING CONTROL VALVE SHALL BE
 PLACED IN THE DISCHARGE PIPE ON THE TANK SIDE OF THE
 CHECK VALVE.
  
 14.2.13 ANTI-VORTEX PLATE ASSEMBLY.
 14.2.13.1 WHERE A TANK IS USED AS THE SUCTION SOURCE
 FOR A FIRE PUMP, THE DISCHARGE OUTLET SHALL BE EQUIPPED
 WITH AN ASSEMBLY THAT CONTROLS VORTEX FLOW.
  
 WESLEY JOLIN
 FIRE INVESTIGATOR & INSPECTOR
 OFFICE OF THE FIRE MARSHAL
 WEST PALM BEACH FIRE RESCUE
 [email protected]
 (561) 805-6730


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved