| 2013-12-30 16:30:39 | RESIDENTIAL (R3) ADDITION/ALTERATION SECOND BUILDING |
| | REVIEW CHECKLIST. |
| | CODE: 2010 FBC. |
| | |
| | 1- BRING PLANS TO PALM BEACH COUNTY (2300 N. JOG RD.) |
| | TO VERIFY IF IMPACT FEES ARE DUE. BRING BACK COUNTY |
| | STAMPED PLANS AND COPY OF PAID RECEIPT IF FEES ARE DUE. |
| | REQUIRED BY THE COUNTY IMPACT FEE ORDINANCE OF THE |
| | UNIFIED LAND DEVELOPMENT CODE (THIS MAY BE DONE LATER |
| | WHEN PERMIT IS READY TO BE ISSUED). |
| | |
| | 2- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY |
| | DCA RULE 9N-3 FOR: |
| | A) WINDOW MULLIONS. NOA 11-0922.01 SUBMITTED WAS |
| | SUPERSEDED BY MIAMI-DADE. VISIT THE MIAMI-DADE WEBSITE |
| | AND DOWNLOAD CURRENT NOA. |
| | |
| | B) ENTRY DOOR AS SHOWN ON PLANS/ELEVATIONS (REPEAT |
| | COMMENT). |
| | |
| | C) NEW STORAGE AND DINING ROOM EXTERIOR DOORS AS SHOWN |
| | ON PLANS/ELEVATIONS. (REPEAT COMMENT). |
| | |
| | D) GLASS BLOCK AS SHOWN ON PLANS/ELEVATIONS. (REPEAT |
| | COMMENT). |
| | |
| | E) SHUTTERS AS SHOWN ON PLANS. SEE SOUTH ELEVATION. AND |
| | PROVIDE COMPLETE INSTALLATION SCHEDULE. (REPEAT |
| | COMMENT). |
| | |
| | F) HURRICANE SHUTTERS IF DOORS AND WINDOWS DON'T HAVE |
| | HURRICANE IMPACT GLAZING. ***NOTE: AND PROVIDE COMPLETE |
| | INSTALLATION SCHEDULE. |
| | |
| | G) ROOF TILE. (REPEAT COMMENT). |
| | |
| | H) ROOF TILE ADHESIVE IF USED FOR TILE FASTENING. SEE |
| | TILE PRODUCT APPROVAL FOR LISTED ADHESIVE. COORDINATE |
| | WITH ITEM #7 BELOW. (REPEAT COMMENT). |
| | |
| | I)PRECAST LINTELS AS SPECIFIED ON PLANS. (REPEAT |
| | COMMENT). |
| | |
| | 3- ENGINEER OF RECORD TO REVIEW AND APPROVE IN WRITING |
| | ABOVE PRODUCT APPROVALS AS REQUIRED BY SEC. 107.3.4.1 |
| | CITY AMENDMENTS TO FBC. |
| | |
| | 4- BEDROOM #3 EGRESS WINDOW: CLARIFY WHAT DOES "EH" |
| | STANDS FOR? THIS ABBREVIATION IS NOT SHOWN ON SHEET |
| | C.1. AND, CLARIFY IF THIS WINDOW IS INCLUDED IN THE |
| | SINGLE HUNG NOA 11-1013.14 SUBMITTED. PRODUCT APPROVAL |
| | REQUIRED BY DCA RULE 9N-3. |
| | |
| | 5- PROVIDE ENERGY CALCULATIONS AS REQUIRED BY SEC. |
| | 101.4.3 OF 2010 FBC-ENERGY CONSERVATION. (REPEAT |
| | COMMENT). |
| | |
| | 6- REVISE DETAIL 1/5.1 (SEC. 107.2.1 CITY AMENDMENTS TO |
| | FBC): |
| | A) REVISE ROOF SHEATHING NAIL TYPE AND SPACING TO MATCH |
| | SPECIFICATIONS ON PLYWOOD SHEATHING NAILING SCHEDULE ON |
| | SHEET 3.1. |
| | ***NOTE: NEED TO SPECIFY RING SHANK NAILS AND THE |
| | SPACING IS DIFFERENT FOR ROOF ZONE #3. |
| | |
| | 7- DESIGNER OF RECORD TO SPECIFY ROOF TILE FASTENING AS |
| | REQUIRED BY SEC. 107.2.1.2 OF CITY AMENDMENTS. (REPEAT |
| | COMMENT). |
| | |
| | ****NOTE: |
| | PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH COMMENT |
| | TO EXPEDITE THE REVIEW PROCESS. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561)805-6712 |
| 2013-12-27 09:54:13 | HAND DELIVERED TO JG |