| Plan Review Notes For Permit 13100137 |
| Permit Number |
13100137 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2013-10-28 09:34:17 | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) THE DESIGN CRITERIA LISTS THE WIND EXPOSURE AS "B," | | | THE ACTUAL EXPOSURE IS "C." | | | 2) DESIGN PRESSURES SHOULD BE CALCULATED AND PROVIDED | | | WITH THE ENGINEERING SUBMITTAL. | | | 3) SHEET 2/3 OF THE ENGINEERING SUBMITTAL PROVIDES | | | ANCHORING DETAILS FOR THE SDG'S ONLY. IT IS UNCLEAR IF | | | THIS IS INTENDED FOR BUCKS, OR THE SGD FRAMES. | | | 4) PURSUANT TO FBC 107.3.4, THE SELECTED WINDOW AND SGD | | | PRODUCT APPROVALS SHALL BE REVIEWED AND APPROVED IN | | | WRITING BY THE DESIGNER OF RECORD FOR THIS | | | INSTALLATION. | | | 5) ALTHOUGH THE INCLUDED CONTRACT IDENTIFIES THE SIZE | | | AND TYPE OF SELECTED PRODUCTS, A SCHEDULE IS PREFERRED | | | FOR THIS PURPOSE. | | | |
|