| Plan Review Notes For Permit 13100124 |
| Permit Number |
13100124 |
|
| Review Stop |
B |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2014-10-20 14:13:44 | 1) SUBMIT COPIES OF THE APPLICABLE SIZING TABLES USED | | | FOR THE SIZING OF THIS SYSYTEM. WPB AMEND. TO 2010 FBC | | | SEC. 107.2.1. | | | 2) SHOW THE LONGEST LENGTH OF PIPING FROM THE POINT OF | | | DELIVERY TO THE MOST REMOTE OUTLET AND SHOW THE TOTAL | | | BTU LOAD ON THE SYSTEM. 2010 FGC SEC.402.4.1. | | | 3) IDENTIFY THE APPLIANCES ON THE SYSTEM.WPB AMEND. TO | | | 2010 FBC SEC. 107.2.1. | | | 4) SHOW THE PSI OF THE SYSTEM ON THE PLANWPB AMEND. TO | | | 2010 FBC SEC. 107.2.1. | | | 5) SOME OF THE BTU LOADS ARE ILLEGIBLE.WPB AMEND. TO | | | 2010 FBC SEC. 107.2.1. | | | 6) SHOW THE CORRESPONDING EHD FOR THE CSST PIPING. WPB | | | AMEND. TO 2010 FBC SEC. 107.2.1. | | | 7) SOME OF THE INFO ON THE TOP OF THE PIPNG PLAN IS CUT | | | OFF. | | | 8) DETAILS # 1 & #2 - WHAT IS THE 75,000 BTU LOAD AT | | | THE TOP OF THE PAGE FOR? THE PIPING PLAN SHOWS THE | | | DETAILS AS 150,000 BTU'S. | | | 9) WHAT DOES DETAIL # 1 & # 2 REPRESENT? WHAT TYPE OF | | | APPLIANCE IS THIS? | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | | | 2014-03-05 10:59:17 | RESTAMP | | 2014-02-25 14:13:08 | 2/25/2014 | | | THIS REVIEW WILL NOT CONTINUE: | | | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & | | | REMOVE & REPLACE ANY PAGES AS NECESSARY. A TRANSMITTAL | | | LETTER LISTING THE ORIGINAL REVIEW COMMENT NUMBER, WITH | | | A DESCRIPTION OF THE REVISION MADE, IDENTIFYING THE | | | SHEET OR SPECIFICATION PAGE WHERE THE CHANGES CAN BE | | | FOUND WILL HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR | | | YOUR ANTICIPATED COOPERATION. | | | |
|