| 2013-10-29 12:03:30 | FBC 2010 PLUMBING REVIEW #1 |
| | DENIED: |
| | |
| | 1. SHEET P-1 & P-2: THE 2ND FLOOR SOIL STACK IS RUNNING |
| | THROUGH THE FIRST FLOOR WET VENT. PLEASE SHOW THE SOIL |
| | STACK DOWNSTREAM OF THE WET VENT. |
| | 909.1 HORIZONTAL WET VENT PERMITTED. |
| | ANY COMBINATION OF FIXTURES WITHIN TWO BATHROOM GROUPS |
| | LOCATED ON THE SAME FLOOR LEVEL IS PERMITTED TO BE |
| | VENTED BY A HORIZONTAL WET VENT. THE WET VENT SHALL BE |
| | CONSIDERED THE VENT FOR THE FIXTURES AND SHALL EXTEND |
| | FROM THE CONNECTION OF THE DRY VENT ALONG THE DIRECTION |
| | OF THE FLOW IN THE DRAIN PIPE TO THE MOST DOWNSTREAM |
| | FIXTURE DRAIN CONNECTION TO THE HORIZONTAL BRANCH |
| | DRAIN. EACH WET-VENTED FIXTURE DRAIN SHALL CONNECT |
| | INDEPENDENTLY TO THE HORIZONTAL WET VENT. ONLY THE |
| | FIXTURES WITHIN THE BATHROOM GROUPS SHALL CONNECT TO |
| | THE WET-VENTED HORIZONTAL BRANCH DRAIN. ANY ADDITIONAL |
| | FIXTURES SHALL DISCHARGE DOWNSTREAM OF THE HORIZONTAL |
| | WET VENT. |
| | |
| | 2. A DRAWING OF THE HOT AND COLD WATER WILL BE REQUIRED |
| | WITH THE LOCATION OF THE WATER HEATER/S. |
| | 107.3.5.1.3 PLUMBING |
| | (1)MINIMUM PLUMBING FACILITIES |
| | (2.) FIXTURE REQUIREMENTS |
| | (3.) WATER SUPPLY PIPING |
| | (5.) WATER HEATERS |
| | ... |
| | |
| | 3. PLEASE INDICATE THE LOCATION OF THE AUTOMATIC |
| | CLOTHES WASHER CONNECTION/S. |
| | TABLE 403.1 |
| | MINIMUM NUMBER OF REQUIRED PLUMBING FIXTURES (R-2) |
| | |
| | REVIEW BY |
| | LARRY WAGNER |
| | CHIEF PLUMBING INSPECTOR |
| | PHONE # 805-6692 |
| | EMAIL [email protected] |
| | FAX # 805-6676 |
| | |