| Date |
Text |
| 2013-10-17 21:16:22 | FAILED |
| | |
| | 1) THE TRASH COMPACTOR (TC) ADJACENT TO BUILDING J-1 IS |
| | NOT SCREENED BY THE SERVICE COURT WALL. THIS WAS SHOWN |
| | IN THE CORRECT LOCATION ON THE CURRENTLY APPROVED |
| | PERMIT PLAN. |
| | |
| | 2) A GENERATOR WAS ADDED IN THE SERVICE COURT NORTH OF |
| | BUILDING J-3. HOW DOES THE CONSTRICTING THE AREA AFFECT |
| | THE ABILITY TO PROVIDE TRASH AND LOADING FUNCTIONS IN |
| | THE SERVICE COURT? |
| | |
| | 3) THE LINE OF SITE PLAN FOR BUILDING J5 NEEDS TO SHOW |
| | IMPACT OF THE 12.5 TON RTU FROM THE NORTH. |
| | |
| | 4) THE LINE OF SITE PLAN FOR BUILDING J7 NEEDS TO SHOW |
| | IMPACT OF THE 12.5 TON RTU FROM THE SOUTH. |
| | |
| | 5) THE LINE OF SITE PLAN FOR BUILDING J8 NEEDS TO SHOW |
| | IMPACT OF THE 12.5 TON RTU FROM THE SOUTH AND THE 10 |
| | TON RTUS THAT ARE OVER THE SERVICE BAYS (THE PARAPET |
| | WALL IS CLOSER TO THE RTU HERE). |
| | |
| | 6) PLEASE PROVIDE THE HEIGHTS OF THE 20 AND 25 TON |
| | RTUS. |
| | |
| | 7) THE EAST ELEVATION FOR BUILDING J6 DOES NOT |
| | ACURATELY REFLECT THE CHANGES TO THE WEST ELEVATION. |
| | |
| | 8) SHEEST M216 AND M218 SHOW 2 OF THE RTU HAVING |
| | DIFFERENT TONAGE THEN THE ROOF PLAN. |
| | |
| | 9) CHANGES REQUIRED TO BE SHOWN ON THE AS-BUILT SITE |
| | PLAN AMENDMENT. |
| | |
| | A. BLDG J-3 GENERATOR |
| | B. BLDG J-4 RELOCATED TREES |
| | C. BLDG J-6 NEW REAR DOOR |
| | D. BLDG J-7 ENTRY |
| | E. BLDG J-1 ENTRY BOLLARDS |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
| 2013-09-13 16:14:26 | 9/13/13 |