| Date |
Text |
| 2013-09-25 16:30:32 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | FROM PREVIOUS LIST: |
| | |
| | 1. REVISE FLOOR PLAN TO SHOW ROOM DESIGNATION FOR THE |
| | EMERGENCY MEANS OF ESCAPE, FBC R310.4: |
| | |
| | THE MEANS OF ESCAPE SHALL BE WITHIN THE FIRST FLOOR OF |
| | THE DWELLING OR DWELLING UNIT AND SHALL NOT BE LOCATED |
| | WITHIN A GARAGE WITHOUT A SIDE-HINGED DOOR LEADING |
| | DIRECTLY TO THE EXTERIOR. OCCUPANTS IN ANY PART OF THE |
| | DWELLING OR DWELLING UNIT SHALL BE ABLE TO ACCESS THE |
| | MEANS OF ESCAPE WITHOUT PASSING THROUGH A LOCKABLE DOOR |
| | NOT UNDER THEIR CONTROL. |
| | |
| | 2ND REVIEW - FLOOR PLAN NOT REVISED. A RESPONSE LETTER |
| | STATES THIS IS A HALL THAT IS ACCESSIBLE FROM |
| | EVERYWHERE INSIDE. REVISE FLOOR PLAN TO SHOW ROOMS |
| | WHICH EXIT INTO THIS HALLWAYS. COMPLIANCE IS NOT SHOWN. |
| | NOTE THAT RESPONSE LETTERS ARE NOT A PART OF THE PERMIT |
| | PACKAGE, AND PLANS ARE TO SHOW CODE COMPLIANCE. |
| | |
| | 2. PLAN INDICATES THAT "ALLOWABLE PRESSURE" IS -120PSF. |
| | SEE SHEET 17 OF THE PRODUCT APPROVAL. THIS IS NOT THE |
| | PRESSURE ALLOWED FOR THE PROPOSED INSTALLATION. ANCHOR |
| | SPACING AND SPANS DO NOT COMPLY. REVISE. |
| | |
| | RESPONSE ACKNOWLEDGED. PLEASE HAVE THE ENGINEER CLARIFY |
| | WHAT "ALLOWABLE PRESSURE" MEANS. THE INSTALLATION AS |
| | PROPOSED BASED ON THE PRODUCT APPROVAL AND THE ANCHOR |
| | SPACING PROPOSED HAS AN ALLOWABLE DESIGN PRESSURE OF |
| | -60, NOT -120. DESIGN PRESSURE OF -120 REQUIRES 6" |
| | SPACING. |
| | |
| | IF ENGINEER WOULD LIKE TO CLARIFY WHAT "ALLOWABLE |
| | PRESSURE" IS ON THE PLAN, PLEASE REVISE TO INCLUDE WHAT |
| | THIS MEANS. THIS IS TYPICALLY THE PRODUCT LIMITATION. |
| | THIS PRODUCT, INSTALLED IN THE MANNER PROPOSED, DOES |
| | NOT MEET THE DP STATED. |
| | |
| | RESPONSE LETTER STATES THAT NONE OF THE DESIGN |
| | PRESSURES EXCEED -40PSF. SEE THE ENGINEERING, NEGATIVE |
| | DESIGN PRESSURES RANGE FROM -40.5 TO -55.6. |
| | |
| | **NEW COMMENT** |
| | |
| | 3. SUGGESTED RESOLUTION - |
| | |
| | CONTRACTOR TO REVISE FLOOR PLAN TO SHOW ROOMS AFFECTED |
| | BY EMERGENCY MEANS OF ESCAPE. |
| | |
| | THE COLUMN "ALLOWABLE PRESSURE" WILL BE REDLINED |
| | (REMOVED) AS ANCHOR SPACING APPEARS COMPLIANT FOR |
| | "DESIGN PRESSURE" REQUIREMENTS. |
| | |
| | |
| | |
| | |
| | |