| 2013-10-11 16:16:08 | REVIEWED BY WDS. |
| | |
| | 1) SHEET E-0 AND E-1 STATES THE PROJECT WAS DESIGNED TO |
| | THE NEC 2011. REVISE TO COMPLY WITH THE CORRECT EDITION |
| | OF THE CODE. |
| | 2) SHEET E-1, PANELBOARD "P" SHOWS CIRCUIT P-23 BEING |
| | USED ON ELECTRICAL FLOOR PLANS. HOWEVER, ON SHEET E-2 |
| | PANELBOARD SCHEDULE CIRCUIT P-23 STATES IT IS A |
| | "SPARE". |
| | 3) ON PANELBOARD "P" SCHEDULE SHOW CIRCUITS P-28,30,32 |
| | AND P-27,29,31 HAS WATER HEATERS THAT ARE NOT SHOWN ON |
| | SHEET E-1. HOWEVER, ON SHEET P-1 THE TWO WATER HEATERS |
| | "A" ARE LOCATED IN THE ELECTORAL ROOM AND THE JANITOR |
| | CLOSET, PROVIDE THE PROPER CLEARANCE IN FRONT OF THE |
| | WATER HEATERS. NEC 110.26(A)(1). |
| | 4) PROVIDE DESIGNATION OF ALL RECEPTACLE AND LIGHTING |
| | CIRCUITS. |
| | 5) DESIGNATE ALL FIXTURES THAT WILL BE ON THE LIGHTING |
| | CONTROL PANEL AND CIRCUITS. |
| | 6) PROVIDE LISTING APPROVAL FOR LIGHTING CONTROL PANEL |
| | AND ASSOCIATED DEVISES CONNECT FOR THE SYSTEM. |
| | 7) REVIEW ELECTRICAL CIRCUITS AND FEEDERS TO COMPLY |
| | WITH FBC ENERGY CONSERVATION CODE SECTION 505.7.3. |
| | 8) PROVIDE LIGHTING STUDY THAT SHOWS THE INTERIOR AND |
| | EXTERIOR LIGHTING POWER DENSITIES IS IN COMPLIANCE WITH |
| | FBC ENERGY CONSERVATION CODE SECTION 505.5.3 AND 505.6. |
| | 9) PROVIDE COMPLIANCE WITH FLASH PROTECTION IN |
| | COMPLIANCE WITH NEC 110.16. |
| | 10) PROVIDE THE AVAILABLE FAULT CURRENT LEVEL AT THE |
| | LINE TERMINALS OF THE EQUIPMENT. NEC 110.9. |
| | 11) PROVIDE THAT ALL LIGHTING IS LISTED. |
| | 12 PROVIDE PHOTOMETRICS FOR THE INTERIOR AND EXTERIOR |
| | LIGHTING. FBC 1006.1. |
| | |
| | SENT TO C-23. |