| Date |
Text |
| 2013-08-21 18:04:30 | RESIDENTIAL (R3) ALTERATION/RENOVATION BUILDING REVIEW |
| | COMMENTS. |
| | CODE: 2010 FBC. |
| | |
| | 1- STAIRS NEED HANDRAILS AS REQUIRED BY SEC. R311.7.7 |
| | OF 2010 FBC-RESIDENTIAL. AND, PROVIDE COMPLETE |
| | SPECIFICATIONS AND DETAILS TO SHOW COMPLIANCE WITH |
| | TABLE R301.5 AND R311.7.7. |
| | |
| | 2- GUARDRAIL MAY BE REQUIRED. SPECIFY ACTUAL HEIGHT OF |
| | LANDING. SEE SEC. R312. PROVIDE COMPLETE DETAIL AND |
| | SPECIFICATIONS SHOWING COMPLIANCE WITH TABLE R301.5 AND |
| | SEC. R312. |
| | |
| | 3- PROVIDE ACCURATE AND COMPLETE ENERGY CALCULATIONS TO |
| | MATCH PLANS. (SEC. 103.2.1.1.2 OF 2010 FBC-ENERGY |
| | CONSERVATION): |
| | A) THIS IS NO NEW CONSTRUCTION. IT'S EXISTING. |
| | |
| | B) CRAWL SPACE NEEDS INSULATION. SEE SEC. 402.4.2 OF |
| | 2010 FBC-ENERGY CONSERVATION AND REVISE. |
| | |
| | C) OWNER/AGENT TO SIGN AND DATE BOTTOM OF FORM. |
| | |
| | D) COMPLETE ALL THE INFORMATION ON TOP OF FORM, |
| | INCLUDING THE BUILDER'S NAME. |
| | |
| | 4- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY |
| | DCA RULE 9N-3 FOR: |
| | A) ROOF SHINGLES. NOA 11-1122.04 SUBMITTED WAS |
| | SUPERSEDED BY MIAMI-DADE. NEED CURRENT NOA. |
| | |
| | B) ALL SIMPSON STRUCTURAL CONNECTORS SPECIFIED ON PLANS |
| | AND DETAILS. PROVIDE ONLY THE PRODUCT APPROVAL COVER |
| | PAGE AND PAGE SHOWING THE SPECIFIED CONNECTOR. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561)805-6712 |