| 2014-04-18 11:55:42 | RESIDENTIAL (R3) ADDITION, MECHANICAL REVIEW COMMENTS |
| | TO NEW INFORMATION SUBMITTED. |
| | CODE: 2010 FBC. |
| | |
| | 1- EQUIPMENT SIZING CALCULATIONS WERE CROSSED DOWN AS |
| | OLD. NO NEW EQUIPMENT SIZING CALCULATIONS WERE |
| | SUBMITTED. PROVIDE NEW EQUIPMENT SIZING CALCULATIONS. |
| | SEC. 403.6 OF 2010 FBC-ENERGY CONSERVATION. |
| | |
| | 2- INFORMATION ON ITEMS #12 AND #13 OF THE ENERGY |
| | CALCULATIONS DON'T MATCH INFORMATION SHOWN ON THE |
| | EQUIPMENT SIZING CALCULATIONS (OLD ONES). COORDINATE |
| | WITH ITEM #1 ABOVE AND REVISE AS REQUIRED TO MATCH. |
| | SEC. 103.2.1.1.2 OF 2010 FBC-ENERGY CONSERVATION. |
| | |
| | 3- EQUIPMENT INFORMATION SHOWN ON THE EQUIPMENT SIZING |
| | CALCULATIONS NEED TO MATCH EQUIPMENT INFORMATION SHOWN |
| | ON THE A/C PLAN. REVISE AS REQUIRED TO MATCH. SEC. |
| | 103.2.2 OF 2010 FBC-ENERGY CONSERVATION. |
| | |
| | 4- A/C PLAN SUBMITTED: |
| | A) HOW MANY AHU UNITS #1 ARE THERE?. THERE IS ONE IN |
| | THE MAIN HOUSE AND ANOTHER ONE IN THE CABANA. SEC. |
| | 107.2.1 CITY AMENDMENTS TO FBC. |
| | |
| | B) WHY ARE THERE TWO AIR HANDLER UNITS SHOWN ON THE |
| | CABANA? AIR HANDLER UNIT #1 AND AIR HANDLER UNIT #2. |
| | SEC. 107.2.1 CITY AMENDMENTS TO FBC. |
| | |
| | C) AIR HANDLER UNIT #1 (MAIN HOUSE) AND #2 (CABANA) |
| | NEED TO COMPLY WITH SEC. M1305.1. SHOW ACCESSS |
| | COMPLIANCE. |
| | |
| | D) CABANA FIRST FLOOR: INFORMATION SHOWN FOR THE A/C |
| | RETURN AIR IS NOT CLEAR. FIRST FLOOR SHOWS A/C RETURN |
| | AND ATTIC ACCESS ON THE SAME SPOT. SECOND FLOOR SHOWS |
| | AHU #2, BUT NOT ATTIC ACCES. REVISE AS REQUIRED. SEC. |
| | 107.2.1 CITY AMENDMENTS TO FBC. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561)805-6712 |