| 2014-01-06 15:18:39 | FAILED |
| | |
| | PLEASE PROVIDE WRITTEN RESPONSES. |
| | |
| | 1) REPEAT COMMENT: PURSUANT TO THE PALM BEACH COUNTY |
| | TRAFFIC PERFORMANCE STANDARDS REVIEW LETTER ISSUED ON |
| | SEPTEMBER 17, 2009, NO BUILDING PERMITS SHALL BE ISSUED |
| | BY THE CITY AFTER DECEMBER 31, 2012. AN EXTENSION OF |
| | THIS DEADLINE MAY BE ISSUED BY PALM BEACH COUNTY. A |
| | MINOR PLANNED DEVELOPMENT AMENDMENT IS REQUIRED TO |
| | UPDATE THE COUNTY BUILD OUT DATE. |
| | |
| | 2) REPEAT COMMENT: PURSUANT TO RESOLUTION NO. 288-11, A |
| | CONSTRUCTION SITE SECURITY AND MANAGEMENT PLAN SHALL BE |
| | SUBMITTED TO THE CITY'S POLICE DEPARTMENT CRIME |
| | PREVENTION THROUGH ENVIRONMENTAL DESIGN ("CPTED") |
| | OFFICIAL AND APPROVED PRIOR TO THE ISSUANCE OF THE |
| | BUILDING PERMIT. (CONTRARY TO THE RESPONSE COMMENT, NO |
| | PLAN HAS BEEN SUBMITTED TO OFFICER KELLY CARSILLO) |
| | |
| | I) THE APPLICANT, AFTER SITE CLEARING AND PLACEMENT OF |
| | CONSTRUCTION TRAILERS, SHALL INSTITUTE SECURITY |
| | MEASURES TO REDUCE OR ELIMINATE OPPORTUNITIES FOR |
| | THEFT. THE MANAGEMENT PLAN SHALL INCLUDE, BUT NOT TO BE |
| | LIMITED TO, TEMPORARY LIGHTING, SECURITY PERSONNEL, |
| | VEHICLE BARRIERS, CONSTRUCTION/VISITOR PASS, |
| | REDUCE/MINIMIZE ENTRY/EXIT POINTS, ENCOURAGE |
| | SUBCONTRACTORS TO SECURE MACHINERY AND TOOLS AT END OF |
| | WORK DAY AND/OR ANY OTHER MEASURE DEEMED APPROPRIATE TO |
| | PROVIDE A SAFE AND SECURE WORKING ENVIRONMENT. |
| | II) THE SECURITY MANAGEMENT PLAN SHALL BE MAINTAINED |
| | THROUGHOUT THE CONSTRUCTION PHASE OF THE PROJECT. |
| | NON-COMPLIANCE WITH THE APPROVED PLAN SHALL RESULT IN A |
| | STOP-WORK ORDER FOR THE ENTIRE PLANNED DEVELOPMENT. |
| | |
| | 3) REPEAT COMMENT: IN ACCORDANCE WITH RESOLUTION NO. |
| | 288-11, ALL ROOF MOUNTED AIR CONDITIONING, MECHANICAL |
| | EQUIPMENT, SATELLITE DISHES, GENERATORS, ETC., SHALL BE |
| | SCREENED FROM VIEW ON ALL SIDES BY A VISUALLY OPAQUE |
| | BARRIER CONSISTENT WITH THE COLOR, CHARACTER AND |
| | ARCHITECTURAL STYLE OF THE STRUCTURES OR EQUIVALENT |
| | LANDSCAPE MATERIAL. THE HEIGHT OF THE OPAQUE BARRIER |
| | SHALL BE AS REQUIRED TO PROVIDE AMPLE SCREENING. |
| | PROVIDE VERIFICATION THAT THE ROOFTOP MECHANICAL |
| | EQUIPMENT WILL BE SCREENED AS REQUIRED BY THE |
| | RESOLUTION FOR THE SPECIFIC EQUIPMENT PROPOSED FOR |
| | INSTALLATION (EX. LINE OF SIGHT OR ELEVATIONS WITH THE |
| | EQUIPMENT). |
| | |
| | 4) THE APPROVED ELEVATIONS FOR BUILDING 7 HAVE CHANGED. |
| | THE ZONING STAFF HAS NOT APPROVED THE REVISED |
| | ELEVATIONS, SPECIFICALLY: |
| | |
| | A. THE PREVIOUS MINOR AMENDMENT APPROVAL FOR BUILDING |
| | #7 PERMITTED THE REDUCTION OF THE CITY COMMISSION |
| | APPROVED 9 DOORS TO 3 DOORS ON THE NORTHERN ELEVATION, |
| | PROVIDED THAT WINDOWS ARE PROVIDED IN THEIR PLACE WHERE |
| | THE 6 DOORS HAD BEEN. THE TWO END BAY LOCATIONS SHALL |
| | INCLUDE WINDOWS. |
| | |
| | B. THE THREE DOORS SHALL HAVE A SIMILAR BANDING AROUND |
| | THEM AS THE WINDOWS TO ENHANCE THE APPEARANCE OF THE |
| | DOORWAY ELEMENTS. THIS WILL OFFSET THE FACT THAT THE |
| | DOORWAYS HAVE BEEN NARROWED WITH THE PROPOSED PLANS |
| | WHEN COMPARED TO THE APPROVED PLANS. PLEASE CONSIDER |
| | ALIGNING THE DOORS IN A SYMMETRICAL PATTERN ALONG THE |
| | FACADE. |
| | |
| | 5) PROVIDE A COPY OF THE REVISED SITE PLAN ONCE IT IS |
| | APPROVED BY ZONING THROUGH THE MINOR AMENDMENT PROCESS. |
| | |
| | 6) THE LANDSCAPE REQUIRES A SEPARATE PERMIT APPLICATION |
| | FOR EACH PARCEL (TRACT A & TRACT F) ON WHICH WORK IS |
| | BEING DONE. THE SAME 2 COPIES OF THE LANDSCAPE PLAN MAY |
| | BE USED FOR BOTH APPLICATIONS (SUBJECT TO CONCURRENT |
| | SUBMITTAL). A COST ESTIMATE IS REQUIRED WITH THE |
| | SUBMITTAL. |
| | |
| | 7) SIGNAGE AND AWNINGS REQUIRE SEPARATE PERMITS WITH |
| | PLANS. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
| | |
| | |
| 2013-10-30 15:08:11 | 10/29/13 |