| Plan Review Notes For Permit 13060229 |
| Permit Number |
13060229 |
|
| Review Stop |
E |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2013-11-25 11:13:59 | RETURNED TO BIN | | 2013-11-25 10:39:21 | THE FOLLOW CORRECTIONS AND/OR CLARIFICATIONS SHALL BE | | | SUBMITTED FOR AN ELECTRICAL PLANS APPROVAL | | | 1. THE TITLE BLOCK INDICATES THAT THE PERMIT IS FOR | | | BLDG. 5 & 6, YET THE CLOUD ON THE HOUSE PANEL IS MADE | | | AROUND THE LOAD FOR UNITS 8, 8A & 9. PLEASE CLARIFY | | | THIS. | | | 2. IF THIS IS BLDGS,5 & 6 OF A LARGER PARCEL, THIS HAS | | | TO BE INDICATED AND A SITE PLAN SUBMITTED. | | | 3. THE LOAD CALCS REFLECTED ON THE E1 PAGE ONLY INCLUDE | | | THE "HP" LOAD. A PANEL SCHEDULE REFLECTING THE | | | INDIVIDUAL LOADS OF EACH OF THE UNITS SHALL BE INCLUDED | | | EVEN IF TYPICAL OF ALL, SO SUCH BE ADDRESSED, THESE | | | UNITS SHALL BE EQUIPPED WITH MINIMAL ELECTRIC FOR LIFE | | | SAFETY. | | | 4. YOU SHALL INCLUDE THE MINIMAL EMERGENCY LIGHTING AND | | | ILLUMINATION FOR LIFE SAFETY. | | | 5. PAGE M1, REFLECTS A ROOF MOUNTED A/C TYPICAL OF EACH | | | UNIT WHICH IS NOT INCLUDED IN ANY ELECTRICAL PANEL | | | 6. A COMPLETE SERVICE DIAGRAM SHALL BE PROVIDED | | | INDICATING THE APPROPRIATE LOAD CALCULATIONS. | | | 7. AS PER THE FBC-ENERGY CONSERVATION SECTION 101.4.9 | | | SHELL BUILDINGS A SUBMITTAL COMPLYING SHALL BE | | | SUBMITTED. |
|